Revision history of "Thermal insulation of apartments Rožmitál in Šumava" (Q76519)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:3021:30, 12 October 2024DG Regio talk contribs 48,823 bytes +1 Changed label, description and/or aliases in pt
  • curprev 21:3021:30, 12 October 2024DG Regio talk contribs 48,822 bytes +11 Set a claim value: summary (P836): O objetivo do projeto é a implementação do sistema de isolamento exterior de contacto no invólucro do perímetro existente (fachada) do edifício, isolamento de telhados, isolamento do teto do último np, isolamento de pisos acima do exterior, isolamento de partes acima do solo do porão, isolamento de telhados de viseiras, reconstrução de loggias, reparação de grades em varandas e trabalhos de manutenção relacionados, outras atividades do projeto são a...

23 March 2024

22 December 2023

6 July 2023

12 June 2023

1 June 2023

17 February 2023

25 July 2022

  • curprev 18:0018:00, 25 July 2022DG Regio talk contribs 46,774 bytes +26,498 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:5101:51, 29 November 2021DG Regio talk contribs 14,381 bytes +1,395 Created claim: summary (P836): L’objet du projet est la réalisation d’un système d’isolation extérieure de contact pour l’enveloppe du bâtiment existant (fasade), l’isolation du toit, l’isolation du plafond du dernier np, l’isolation des planchers au-dessus de l’extérieur, l’isolation des parties hors sol du sous-sol, l’isolation des toits des lucarnes, la reconstruction des loggias, la réparation des garde-corps sur les balcons et les travaux d’entretien connexes, la prépara...
  • curprev 01:5101:51, 29 November 2021DG Regio talk contribs 12,986 bytes +121 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:5622:56, 23 October 2020DG Regio talk contribs 13,314 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:5622:56, 23 October 2020DG Regio talk contribs 13,201 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:5622:56, 23 October 2020DG Regio talk contribs 13,319 bytes +1,314 Created claim: summary (P836): The object of the project is the implementation of the contact outdoor insulation system on the existing perimeter casing (fasade) of the building, insulation of roofs, insulation of the ceiling of the last np, insulation of floors above the exterior, insulation of above-ground parts of the basement, insulation of roofs of visors, reconstruction of loggias, repair of railings on balconies, and related maintenance work, further activities of the...
  • curprev 22:5622:56, 23 October 2020DG Regio talk contribs 12,005 bytes −854 Removed claim: summary (P836): The aim of the project is to implement the primary heating system on the existing envelope (facade) of the building, insulation of roofs, insulation of the upper last np ceiling, insulation of the hot spot, insulation of the vironies, reconstruction of the rails, repair of the railings on balconies, repair of the railings on balconies, repair of the railings on the balconies, and the related maintenance work, the related administrative work, t...

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:2506:25, 27 February 2020DG Regio talk contribs 11,056 bytes +854 Created claim: summary (P836): The aim of the project is to implement the primary heating system on the existing envelope (facade) of the building, insulation of roofs, insulation of the upper last np ceiling, insulation of the hot spot, insulation of the vironies, reconstruction of the rails, repair of the railings on balconies, repair of the railings on balconies, repair of the railings on the balconies, and the related maintenance work, the related administrative work, the...

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020