Revision history of "Revitalisation and reduction of energy performance of the apartment house Hornická 1525-1526, Tišnov" (Q76147)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2921:29, 12 October 2024DG Regio talk contribs 47,882 bytes −2 Changed label, description and/or aliases in pt
  • curprev 21:2921:29, 12 October 2024DG Regio talk contribs 47,884 bytes +15 Set a claim value: summary (P836): Objetivo do projeto Revitalização e redução do desempenho energético do apartamento Hornická 1525-1526, Tišnov. As modificações do edifício dizem respeito ao isolamento das paredes do perímetro do edifício, ao isolamento do telhado plano, ao isolamento do teto acima do porão em salas selecionadas, à conclusão da substituição de orifícios, à vitrificação de loggias e a outros trabalhos conexos.

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 17:2917:29, 25 July 2022DG Regio talk contribs 45,197 bytes +25,474 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:5101:51, 29 November 2021DG Regio talk contribs 14,136 bytes +1,244 Created claim: summary (P836): L’objectif du projet Revitalisation et réduction de l’intensité énergétique de l’immeuble Hornická 1525-1526, Tišnov. Les travaux de construction concernent l’isolation des murs du périmètre du bâtiment, l’isolation du toit plat, l’isolation du plafond au-dessus du sous-sol dans des locaux sélectionnés, l’achèvement du remplacement des trous, le vitrage des billes et d’autres travaux connexes., translated_summary
  • curprev 01:5101:51, 29 November 2021DG Regio talk contribs 12,892 bytes +164 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 13,177 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 13,015 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 13,163 bytes +1,202 Created claim: summary (P836): Objective of the project Revitalisation and reduction of energy performance of the apartment house Hornická 1525-1526, Tišnov. Building modifications concern insulation of the perimeter walls of the building, insulation of flat roof, insulation of the ceiling above the basement in selected rooms, completion of the replacement of holes, glazing of loggias and other related work., translated_summary
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 11,961 bytes −771 Removed claim: summary (P836): The aim of the project will be to promote and reduce the energy intensity of the building house 1525-1526, Tišnov. The construction works relate to the insulation of the wall walls of the building, the insulation of the flat roof, the insulation of the ceiling above the basement in the selected rooms, the completion of the opening of the holes, the glazing of the glazing and other related works., remove_old_english_translation

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:3506:35, 27 February 2020DG Regio talk contribs 10,930 bytes +771 Created claim: summary (P836): The aim of the project will be to promote and reduce the energy intensity of the building house 1525-1526, Tišnov. The construction works relate to the insulation of the wall walls of the building, the insulation of the flat roof, the insulation of the ceiling above the basement in the selected rooms, the completion of the opening of the holes, the glazing of the glazing and other related works., Adding English summary

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020