Revision history of "Construction works BD No.662, Bílovec" (Q76081)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2921:29, 12 October 2024DG Regio talk contribs 46,224 bytes −2 Changed label, description and/or aliases in pt
  • curprev 21:2921:29, 12 October 2024DG Regio talk contribs 46,226 bytes −16 Set a claim value: summary (P836): O projeto resolve:-integração do invólucro circunferencial-integração do plinto-integração do aquecimento piso-piso no teto de temperatura do solo sobre 2NP-substituição de janelas e portas-substituição da distribuição interna de água quente-substituição de aquecimento-substituição de aquecimento-substituição de andaimes na obra.

7 March 2024

15 January 2024

22 December 2023

6 July 2023

12 June 2023

1 June 2023

17 February 2023

25 July 2022

  • curprev 17:2517:25, 25 July 2022DG Regio talk contribs 43,051 bytes +23,344 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:5001:50, 29 November 2021DG Regio talk contribs 14,054 bytes +1,366 Created claim: summary (P836): Le projet résout:-isolation de la gaine extérieure-isolation du plancher isolant sur le plafond de chauffage au sol au-dessus de 2NP-remplacement des fenêtres et des portes-remplacement de la distribution d’eau chaude interne-remplacement de la source de chauffage-remplacement de la distribution du chauffage par le sol-remplacement du chauffage par le sol-installation de la construction de chauffage par le sol et travaux préparatoires-camping-co...
  • curprev 01:5001:50, 29 November 2021DG Regio talk contribs 12,688 bytes +105 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:1522:15, 23 October 2020DG Regio talk contribs 13,032 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:1522:15, 23 October 2020DG Regio talk contribs 12,935 bytes −104 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:1522:15, 23 October 2020DG Regio talk contribs 13,039 bytes +1,168 Created claim: summary (P836): The project solves:-integration of the circumferential casing-integration of the plinth-integration of the floor-floor heating on the ground-intemperature ceiling over 2NP-replacement of windows and doors-replacement of internal hot water distribution-replacement of heating-replacement heating-replacement of scaffoldings in the construction work., translated_summary
  • curprev 22:1522:15, 23 October 2020DG Regio talk contribs 11,871 bytes −878 Removed claim: summary (P836): The project deals with: the insulation of the perimeter retractable of the open-floor sun containment station at the ceiling above 2NP-exchange of windows and door interchange of the internal distribution of the domestic hot water distribution system, the exchange of a source for the exchange of a source for the replacement of a heat exchange source with building and preparatory work, building on the construction of leopard works, and the cons...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:3406:34, 27 February 2020DG Regio talk contribs 10,522 bytes +878 Created claim: summary (P836): The project deals with: the insulation of the perimeter retractable of the open-floor sun containment station at the ceiling above 2NP-exchange of windows and door interchange of the internal distribution of the domestic hot water distribution system, the exchange of a source for the exchange of a source for the replacement of a heat exchange source with building and preparatory work, building on the construction of leopard works, and the constr...

18 February 2020

7 February 2020

28 January 2020

11 January 2020