Revision history of "Strakonice – Insulated houses No. 204, 205 and 206 in the street of builders" (Q76054)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:1415:14, 13 October 2024DG Regio talk contribs 51,092 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:1415:14, 13 October 2024DG Regio talk contribs 51,093 bytes −11 Set a claim value: summary (P836): O objeto do projeto é o isolamento do edifício de apartamentos (n.os 204, 205 e 206) na rua dos construtores em Strakonice. Na etapa anterior, as janelas foram substituídas, as inserções isolantes inter-janelas originais foram substituídas e as janelas de metal na escada foram demolidas. As alterações de construção na fase atual, que fazem parte do projeto, dizem respeito ao isolamento da envolvente do edifício – estruturas opacas. Os tetos do piso...

12 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 17:2217:22, 25 July 2022DG Regio talk contribs 46,888 bytes +27,371 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4401:44, 29 November 2021DG Regio talk contribs 13,474 bytes +1,421 Created claim: summary (P836): L’objet du projet est l’isolation d’un immeuble d’habitation (no 204, 205 et 206) dans la rue Stavbařů à Strakonice. À l’étape précédente, les fenêtres ont été remplacées, les inserts isolants d’origine inter-fenêtres ont été briques et les fenêtres métalliques de la zone entière de l’escalier ont été démolies. Les travaux de construction dans la phase actuelle, qui font partie du projet, concernent l’isolation de l’enveloppe du bâtiment — struc...
  • curprev 01:4401:44, 29 November 2021DG Regio talk contribs 12,053 bytes +157 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:1522:15, 23 October 2020DG Regio talk contribs 12,345 bytes +137 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:1522:15, 23 October 2020DG Regio talk contribs 12,208 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:1522:15, 23 October 2020DG Regio talk contribs 12,363 bytes +1,363 Created claim: summary (P836): The object of the project is the insulation of the apartment building (No. 204, 205 and 206) in the street of builders in Strakonice. In the previous stage the windows were replaced, the original inter-window insulating inserts were replaced and the metal windows on the staircase were demolished. The construction modifications in the current phase, which are part of the project, relate to the insulation of the building envelope – opaque structur...
  • curprev 22:1522:15, 23 October 2020DG Regio talk contribs 11,000 bytes −872 Removed claim: summary (P836): The project concerns the insulation of apartment blocks (Nos 204, 205 and 206) in street builders in Strakonice. At the previous stage, windows were exchanged, the original mesiokday insulating liners and the cut of the all-surface metal window on the stairs have been replaced. The construction works in the current stage, which are part of the project, concern the insulation of the envelope of the building — opaque structures. Nappies will als...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3406:34, 27 February 2020DG Regio talk contribs 10,100 bytes +872 Created claim: summary (P836): The project concerns the insulation of apartment blocks (Nos 204, 205 and 206) in street builders in Strakonice. At the previous stage, windows were exchanged, the original mesiokday insulating liners and the cut of the all-surface metal window on the stairs have been replaced. The construction works in the current stage, which are part of the project, concern the insulation of the envelope of the building — opaque structures. Nappies will also...

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020