Revision history of "Reduction of energy intensity and reconstruction of the housing house Havlíčkova 1142 in Holešov" (Q76025)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:1315:13, 13 October 2024DG Regio talk contribs 49,517 bytes −12 Set a claim value: summary (P836): Reconstrução complexa do edifício de apartamentos que consiste principalmente na instalação da habitação circunferencial e a sua reconstrução isolada de coberturas troca de preenchimentos de orifícios de acordo com a documentação do projecto da reconstrução de impermeabilização no caso de estar directamente relacionada com o isolamento OBV. ConstruçãoMovimentos de detritos e materiais degradados relacionados com as medidas objeto de auxílio

12 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 17:2017:20, 25 July 2022DG Regio talk contribs 46,335 bytes +26,275 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4301:43, 29 November 2021DG Regio talk contribs 14,280 bytes +1,286 Created claim: summary (P836): Reconstruction complexe de l’immeuble d’appartements consistant principalement en la remise en état de la gaine extérieure et son isolationreconstruction du revêtement de toiture remplacement des charges d’ouverture selon la documentation du projetreconstruction de l’étanchéité loggiarepair au cas où il est directement lié à l’isolation du bâtiment. ConstructionTransferts de décombres et de matériaux démolis liés à des mesures de soutien, transl...
  • curprev 01:4301:43, 29 November 2021DG Regio talk contribs 12,994 bytes +181 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:1422:14, 23 October 2020DG Regio talk contribs 13,262 bytes +158 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:1422:14, 23 October 2020DG Regio talk contribs 13,104 bytes −164 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:1422:14, 23 October 2020DG Regio talk contribs 13,268 bytes +1,243 Created claim: summary (P836): Complex reconstruction of the apartment building consisting mainly of the installation of the circumferential housing and its insulated reconstruction of roof coverings exchange of hole fillings according to the project documentation of the reconstruction of waterproofing in case that it is directly related to OBV insulation insulation. ConstructionMovements of debris and degraded materials related to the aided measures, translated_summary
  • curprev 22:1422:14, 23 October 2020DG Regio talk contribs 12,025 bytes −800 Removed claim: summary (P836): The complex reconstruction of the building stock consisting of, in particular, the rehabilitation of the building envelope and the beginning of the renovation of the roof attachment of the building blocks, as described in the project documentation, carry out hydrological insulation corrections in case they are directly related to the wall of the building. Konstruktin suta and cut out in connection with the measures supported, remove_old_englis...

24 September 2020

21 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1006:10, 27 February 2020DG Regio talk contribs 11,048 bytes +800 Created claim: summary (P836): The complex reconstruction of the building stock consisting of, in particular, the rehabilitation of the building envelope and the beginning of the renovation of the roof attachment of the building blocks, as described in the project documentation, carry out hydrological insulation corrections in case they are directly related to the wall of the building. Konstruktin suta and cut out in connection with the measures supported, Adding English summary

18 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020