Revision history of "BD Bašť 15" (Q75838)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:1315:13, 13 October 2024DG Regio talk contribs 48,155 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:1315:13, 13 October 2024DG Regio talk contribs 48,156 bytes 0 Set a claim value: summary (P836): O objeto do projeto é uma casa na parte norte do distrito de Praga-Leste, na aldeia de Bášť, n.o 15, na parcela p. n.o st. 25/2, LV 441. O projeto resolve a substituição dos restantes enchimentos e isolamento da envolvente do edifício. Está preparado para a redução de energia de acordo com os requisitos do IROP de poupança de 40 %. O objetivo do projeto é reduzir os custos de aquecimento para os residentes da casa em convergência com o efeito de red...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 17:0317:03, 25 July 2022DG Regio talk contribs 45,484 bytes +25,725 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4401:44, 29 November 2021DG Regio talk contribs 14,115 bytes +1,337 Created claim: summary (P836): L’objet du projet est une maison dans la partie nord du quartier Prague-Est, dans le village de Bášt', no 15, sur la parcelle no 25/2, LV 441. Le projet porte sur le remplacement des remplissages restants et l’isolation de l’enveloppe du bâtiment. Il est prêt à réduire l’énergie selon les exigences IROP de 40 % d’économies. L’objectif du projet est de réduire les coûts de chauffage des résidents de la maison en convergence avec l’effet de réduir...
  • curprev 01:4401:44, 29 November 2021DG Regio talk contribs 12,778 bytes +70 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:4821:48, 23 October 2020DG Regio talk contribs 13,157 bytes +71 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4821:48, 23 October 2020DG Regio talk contribs 13,086 bytes −71 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4821:48, 23 October 2020DG Regio talk contribs 13,157 bytes +1,309 Created claim: summary (P836): The object of the project is a house in the northern part of the district Prague-East, in the village of Bášť, no. 15, on plot p. no. st. 25/2, LV 441. The project solves the replacement of remaining fillings and insulation of the building envelope. It is prepared for energy reduction according to IROP requirements of 40 % savings. The aim of the project is to reduce heating costs for residents of the house in convergence with the effect of redu...
  • curprev 21:4821:48, 23 October 2020DG Regio talk contribs 11,848 bytes −883 Removed claim: summary (P836): The purpose of the project is the home in the northern part of the Prague-East District, in the municipality of Běraa, number 15, on parcel No. 25/2, LV 441. The project will cover the upgrading and insulation of the building envelope. It is ready for energy reduction according to the IROP requirements at the level of 40 % of the savings. The aim of the project is to reduce the cost of heating the population of a building in convergence with t...

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1906:19, 27 February 2020DG Regio talk contribs 10,927 bytes +883 Created claim: summary (P836): The purpose of the project is the home in the northern part of the Prague-East District, in the municipality of Běraa, number 15, on parcel No. 25/2, LV 441. The project will cover the upgrading and insulation of the building envelope. It is ready for energy reduction according to the IROP requirements at the level of 40 % of the savings. The aim of the project is to reduce the cost of heating the population of a building in convergence with the...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020