Revision history of "Reduction of energy intensity STAVEBER FEATURES Being a SALE, Navrátilova 1376/2" (Q75799)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:1115:11, 13 October 2024DG Regio talk contribs 49,524 bytes +9 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 13 October 2024DG Regio talk contribs 49,515 bytes +1 Set a claim value: summary (P836): O objetivo do investimento é concluir o isolamento e a revitalização de um edifício de apartamentos a partir dos anos 50, onde, até à data, apenas foram realizados investimentos parciais em poupança de energia (troca de janelas e portas de entrada de plástico). O projeto permitirá um isolamento complexo do edifício, incluindo um isolamento uniforme do invólucro exterior do edifício e do telhado do edifício, poupando assim energia relacionada com o a...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:5816:58, 25 July 2022DG Regio talk contribs 46,840 bytes +26,682 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4601:46, 29 November 2021DG Regio talk contribs 14,336 bytes +1,370 Created claim: summary (P836): L’objectif de l’investissement est l’isolation complète et la revitalisation d’un immeuble d’habitation des années 1950, où seuls des investissements partiels dans les économies d’énergie (remplacement des fenêtres en plastique et des portes d’entrée) ont été réalisés jusqu’à présent. La mise en œuvre du projet permettra une isolation complexe du bâtiment, y compris l’isolation de l’enveloppe du bâtiment et du toit du bâtiment, ce qui permettra...
  • curprev 01:4601:46, 29 November 2021DG Regio talk contribs 12,966 bytes +152 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:4721:47, 23 October 2020DG Regio talk contribs 13,263 bytes +140 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4721:47, 23 October 2020DG Regio talk contribs 13,123 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4721:47, 23 October 2020DG Regio talk contribs 13,255 bytes +1,263 Created claim: summary (P836): The aim of the investment is to complete insulation and revitalisation of an apartment building from the 50s, where so far only partial investments in energy savings (exchange of plastic windows and entrance doors) have been made. The project will enable complex insulation of the building, including uniform insulation of the building’s outer shell and the roof of the building, thereby saving energy related to the heating of the building., transl...
  • curprev 21:4721:47, 23 October 2020DG Regio talk contribs 11,992 bytes −817 Removed claim: summary (P836): The aim of the investment is to complete the insulation and revitalisation of the building stock from the 50s, which has so far only partially invested in energy saving (exchange of plastic windows and gates). The implementation of the project will allow for a comprehensive insulation of the building, including the insulation of the building envelope and the roof of the building, thus saving the energy related to the heating of the building.,...

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1906:19, 27 February 2020DG Regio talk contribs 11,007 bytes +817 Created claim: summary (P836): The aim of the investment is to complete the insulation and revitalisation of the building stock from the 50s, which has so far only partially invested in energy saving (exchange of plastic windows and gates). The implementation of the project will allow for a comprehensive insulation of the building, including the insulation of the building envelope and the roof of the building, thus saving the energy related to the heating of the building., Ad...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020