Revision history of "Revitalisation of the apartment building Za Branou 1006" (Q75789)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:5716:57, 25 July 2022DG Regio talk contribs 45,903 bytes +26,038 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4501:45, 29 November 2021DG Regio talk contribs 14,214 bytes +1,358 Created claim: summary (P836): Le projet a pour objet la mise en place d’un système d’isolation extérieure de contact sur l’enveloppe existante du bâtiment (facade) (y compris les murs de la salle des machines), d’un nouveau revêtement de toiture, y compris son isolation, le remplacement des ouvertures de l’ascenseur de la salle des machines, le remplacement des balcons existants, le remplacement des garde-corps aux fenêtres françaises, la construction de toits de toit au-des...
  • curprev 01:4501:45, 29 November 2021DG Regio talk contribs 12,856 bytes +104 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:4621:46, 23 October 2020DG Regio talk contribs 13,201 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4621:46, 23 October 2020DG Regio talk contribs 13,087 bytes −88 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4621:46, 23 October 2020DG Regio talk contribs 13,175 bytes +1,276 Created claim: summary (P836): The object of the project is the implementation of the contact outdoor insulation system on the existing perimeter casing (fasade) of the building (including machinery room walls), new roof covering of the roof, including its insulation, replacement of the openings of the lift engine room, replacement of existing balconies, replacement of railings at French windows, construction of roofs above the last balconies and other related and maintenance...
  • curprev 21:4621:46, 23 October 2020DG Regio talk contribs 11,899 bytes −830 Removed claim: summary (P836): The purpose of the project is to implement the contact external heating system on the existing building envelope (façade) of the building (including machinery walls), a new roof covering of the roof including the insulation of the building, the replacement of the engine room space, the replacement of existing balconies, the exchange of railings in French windows, the carrying out of top ups over the last balconies and other related and mainten...

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1906:19, 27 February 2020DG Regio talk contribs 10,928 bytes +830 Created claim: summary (P836): The purpose of the project is to implement the contact external heating system on the existing building envelope (façade) of the building (including machinery walls), a new roof covering of the roof including the insulation of the building, the replacement of the engine room space, the replacement of existing balconies, the exchange of railings in French windows, the carrying out of top ups over the last balconies and other related and maintenan...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020