Revision history of "Thermal insulation of apartment building Tyršova 832, Kostelec n. Black forests" (Q75749)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:1015:10, 13 October 2024DG Regio talk contribs 48,891 bytes +49 Set a claim value: summary (P836): O projeto inclui a reconstrução completa do telhado, a reconstrução do invólucro e a reparação do pavimento da calha. O objetivo do projeto é reduzir o desempenho energético do edifício. Atividades para reconstruir o telhado – a remoção da camada de telhado existente com uma nova camada de telhado plano inclinado para duas entradas internas do telhado. Para o isolamento do objecto é proposto um sistema de isolamento de contacto (placa de isolamento...

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

13 August 2022

  • curprev 16:1016:10, 13 August 2022DG Regio talk contribs 47,691 bytes +27,730 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv, cs, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4501:45, 29 November 2021DG Regio talk contribs 13,957 bytes +1,376 Created claim: summary (P836): Le projet consiste en une reconstruction complète du toit, la reconstruction de la coque du bâtiment et la réparation du trottoir évacué. L’objectif du projet est d’améliorer la performance énergétique du bâtiment. Activités de reconstruction du toit — enlèvement de la couche de toit existante avec une nouvelle couche de pente de toit plat à deux entrées internes de toit. Un système d’isolation de contact (plaques isolantes en polystyrène) est c...
  • curprev 01:4501:45, 29 November 2021DG Regio talk contribs 12,581 bytes +125 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:4521:45, 23 October 2020DG Regio talk contribs 12,905 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4521:45, 23 October 2020DG Regio talk contribs 12,766 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4521:45, 23 October 2020DG Regio talk contribs 12,885 bytes +1,339 Created claim: summary (P836): The project includes complete reconstruction of the roof, reconstruction of the casing and repair of the gutter pavement. The aim of the project is to reduce the energy performance of the building. Activities to reconstruct the roof – the removal of the existing roof layer with a new layer of flat roof inclined to two inner roof inlets. For insulation of the object is proposed a contact insulation system (insulating plate made of polystyrene). T...
  • curprev 21:4521:45, 23 October 2020DG Regio talk contribs 11,546 bytes −896 Removed claim: summary (P836): The project content is a complete reconstruction of the roof, the reconstruction of the building envelope and the repair of the bonnet pavement repair. The project aims at reducing the energy performance of the building. Activities for the renovation of the roof — removal of the existing roof layer with a new layer of flat roof with two internal roof openings. An insulation plate (polystyrene insulating board) is proposed for the insulation of...

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 10,640 bytes +896 Created claim: summary (P836): The project content is a complete reconstruction of the roof, the reconstruction of the building envelope and the repair of the bonnet pavement repair. The project aims at reducing the energy performance of the building. Activities for the renovation of the roof — removal of the existing roof layer with a new layer of flat roof with two internal roof openings. An insulation plate (polystyrene insulating board) is proposed for the insulation of t...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020