Revision history of "Building modifications of apartment buildings HARMONIE I and II, Rybářská no. 1810, 1819 Insulated insulation of the perimeter and roof coat" (Q75691)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2921:29, 12 October 2024DG Regio talk contribs 51,086 bytes −2 Changed label, description and/or aliases in pt
  • curprev 21:2921:29, 12 October 2024DG Regio talk contribs 51,088 bytes +5 Set a claim value: summary (P836): O objetivo do projeto é reduzir o desempenho energético de duas habitações HARMONIE I. e II. através de envolventes isoladas do edifício e alcançar uma poupança de energia total fornecida de, pelo menos, 30 % em comparação com a situação anterior à aplicação da medida, atingindo a classe de classificação da energia total fornecida C ou melhor e, ao mesmo tempo, cumprindo os requisitos para um nível ótimo de rentabilidade de acordo com a alínea a) ou...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 16:5116:51, 25 July 2022DG Regio talk contribs 49,419 bytes +29,046 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4401:44, 29 November 2021DG Regio talk contribs 14,138 bytes +1,409 Created claim: summary (P836): L’objectif du projet est de réduire l’intensité énergétique de deux immeubles à appartements HARMONIE I. et II. en isolant les enveloppes du bâtiment et en réalisant des économies d’au moins 30 % de l’énergie totale fournie par rapport à l’état avant la mise en œuvre de la mesure, en atteignant la classe de classification de l’énergie totale fournie C ou mieux, tout en satisfaisant aux exigences d’un niveau optimal en fonction des coûts visés a...
  • curprev 01:4401:44, 29 November 2021DG Regio talk contribs 12,729 bytes +192 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:5822:58, 23 October 2020DG Regio talk contribs 12,986 bytes +203 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:5822:58, 23 October 2020DG Regio talk contribs 12,783 bytes −206 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:5822:58, 23 October 2020DG Regio talk contribs 12,989 bytes +1,361 Created claim: summary (P836): The aim of the project is to reduce the energy performance of two housing houses HARMONIE I. and II. by insulated envelopes the building and achieving a savings of total energy delivered at a minimum of 30 % compared to the situation prior to the implementation of the measure, achieving the classification class of the total energy supplied C or better and at the same time fulfilling the requirements for cost-optimal level according to letter (a...
  • curprev 22:5822:58, 23 October 2020DG Regio talk contribs 11,628 bytes −868 Removed claim: summary (P836): The aim of the project is to reduce the energy performance of two apartment blocks of harmony I and II. I turn down the building and achieving a saving of the total energy supplied at a minimum of 30 % compared to the status before the measure is implemented, the achievement of class C in class C or better, and meeting the cost-optimal requirements for the cost-optimal levels referred to in points (a) or (b), section 2, Section 6 of Decree No...

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:3206:32, 27 February 2020DG Regio talk contribs 10,701 bytes +868 Created claim: summary (P836): The aim of the project is to reduce the energy performance of two apartment blocks of harmony I and II. I turn down the building and achieving a saving of the total energy supplied at a minimum of 30 % compared to the status before the measure is implemented, the achievement of class C in class C or better, and meeting the cost-optimal requirements for the cost-optimal levels referred to in points (a) or (b), section 2, Section 6 of Decree No 7...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

28 January 2020

11 January 2020