Revision history of "Revitalisation of the apartment building Pulická in Dobruška" (Q75608)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2721:27, 12 October 2024DG Regio talk contribs 52,360 bytes +37 Set a claim value: summary (P836): O edifício de apartamentos foi construído em 1979 no sistema de painéis T 06 Bu. Este sistema não cumpre os requisitos atuais em matéria de propriedades térmicas técnicas. O projeto implica uma melhoria significativa das propriedades termicamente técnicas que constituem a envolvente do edifício, a fim de cumprir os objetivos do projeto. O objetivo do projeto é a remediação e proteção da superfície das paredes do perímetro através do sistema de isola...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:4516:45, 25 July 2022DG Regio talk contribs 49,649 bytes +28,599 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4301:43, 29 November 2021DG Regio talk contribs 14,682 bytes +1,535 Created claim: summary (P836): L’immeuble a été construit en 1979 dans le système de panneaux T 06 Bu. Ce système ne répond pas aux exigences actuelles en matière de caractéristiques thermiques et techniques. Le projet implique une amélioration significative des caractéristiques thermiques et techniques de l’enveloppe du bâtiment afin d’atteindre les objectifs du projet. L’objet du projet est l’assainissement et la protection de la surface des parois du périmètre par un systè...
  • curprev 01:4301:43, 29 November 2021DG Regio talk contribs 13,147 bytes +111 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:5322:53, 23 October 2020DG Regio talk contribs 13,485 bytes +121 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:5322:53, 23 October 2020DG Regio talk contribs 13,364 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:5322:53, 23 October 2020DG Regio talk contribs 13,480 bytes +1,421 Created claim: summary (P836): The apartment building was built in 1979 in the panel system T 06 Bu. This system does not meet today’s requirements for thermally technical properties. The project involves a significant improvement of the thermally technical properties constituting the building envelope in order to meet the objectives of the project. The object of the project is remediation and surface protection of perimeter walls by contact thermal insulation system, roof co...
  • curprev 22:5322:53, 23 October 2020DG Regio talk contribs 12,059 bytes −991 Removed claim: summary (P836): The apartment house was built in 1979 in the T-06 longitudinal panel. This system does not meet the requirements of today’s thermal technical characteristics. The project involves a significant improvement in the thermal performance of the building envelope in order to meet the project objectives. The purpose of the project is the remediation and the surface protection of the peripheral walls of the contact thermal insulation system, the insul...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1806:18, 27 February 2020DG Regio talk contribs 11,272 bytes +991 Created claim: summary (P836): The apartment house was built in 1979 in the T-06 longitudinal panel. This system does not meet the requirements of today’s thermal technical characteristics. The project involves a significant improvement in the thermal performance of the building envelope in order to meet the project objectives. The purpose of the project is the remediation and the surface protection of the peripheral walls of the contact thermal insulation system, the insulat...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020