Revision history of "Reconstruction of the apartment building Komorní Lhotka 281" (Q75574)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2721:27, 12 October 2024DG Regio talk contribs 48,111 bytes +5 Set a claim value: summary (P836): No âmbito da reconstrução da casa de apartamentos haverá, entre outros, isolamento térmico da casca exterior e isolamento do teto acima do último andar. Os enchimentos insatisfatórios do furo serão substituídos. Além disso, reparos de condutores de raios e elementos de encanamento serão realizados no âmbito da reconstrução. O objetivo do projeto será alcançado através do cumprimento de todas as medidas resultantes da documentação do projeto.

20 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:4216:42, 25 July 2022DG Regio talk contribs 45,434 bytes +25,741 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:4301:43, 29 November 2021DG Regio talk contribs 14,162 bytes +1,298 Created claim: summary (P836): Dans le cadre de la reconstruction de l’immeuble d’appartements, il y aura isolation du revêtement du périmètre et de l’isolation du plafond au-dessus du dernier étage. Les remplissages de trous non conformes seront remplacés. En outre, des réparations de paratonnerres et d’éléments de plomberie seront effectuées dans le cadre de la reconstruction. L’objectif du projet sera atteint en réalisant toutes les mesures résultant de la documentation du...
  • curprev 01:4301:43, 29 November 2021DG Regio talk contribs 12,864 bytes +109 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:5222:52, 23 October 2020DG Regio talk contribs 13,204 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:5222:52, 23 October 2020DG Regio talk contribs 13,085 bytes −124 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:5222:52, 23 October 2020DG Regio talk contribs 13,209 bytes +1,293 Created claim: summary (P836): Within the framework of the reconstruction of the apartment house there will be inter alia thermal insulation of the outer shell and insulation of the ceiling above the last floor. Unsatisfactory hole fillings will be replaced. In addition, repairs of lightning conductors and plumbing elements will be carried out within the framework of the reconstruction. The objective of the project will be achieved by fulfilling all measures resulting from th...
  • curprev 22:5222:52, 23 October 2020DG Regio talk contribs 11,916 bytes −793 Removed claim: summary (P836): As part of the reconstruction of the building stock, there will be a insulation of the building envelope and the insulation of the ceiling above the last deck. Unsatisfactory ottos will be replaced. In addition, corrections will be made to lightning conductors and tongs as part of the reconstruction process. The objective of the project will be achieved by fulfilling all the measures resulting from the project fiches., remove_old_english_trans...

24 September 2020

22 September 2020

15 September 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1806:18, 27 February 2020DG Regio talk contribs 10,933 bytes +793 Created claim: summary (P836): As part of the reconstruction of the building stock, there will be a insulation of the building envelope and the insulation of the ceiling above the last deck. Unsatisfactory ottos will be replaced. In addition, corrections will be made to lightning conductors and tongs as part of the reconstruction process. The objective of the project will be achieved by fulfilling all the measures resulting from the project fiches., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020