Revision history of "Insulation and replacement of the apartment building no. 197, Hradec nad Moravicí – Stage II" (Q75352)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:2616:26, 25 July 2022DG Regio talk contribs 49,868 bytes +28,741 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3601:36, 29 November 2021DG Regio talk contribs 14,729 bytes +1,505 Created claim: summary (P836): L’objet du projet est les travaux de construction de la maison no 197 dans le cadre de la deuxième étape menant à la réalisation d’économies d’énergie du bâtiment existant et à la fourniture de réparations de parties de façades inadaptées. Il s’agit notamment de l’isolation de la façade, de l’isolation des sols, du remplacement des ouvertures des fenêtres et des portes sur les façades nord, sud et orientale, du remplacement des éléments de serru...
  • curprev 01:3601:36, 29 November 2021DG Regio talk contribs 13,224 bytes +173 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 13,500 bytes +154 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 13,346 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 13,479 bytes +1,377 Created claim: summary (P836): The object of the project are building modifications to house No. 197 within the second stage leading to energy savings of the existing building and ensuring repairs of unsatisfactory parts of the façades. These include insulated façades, insulation of soils, exchange of window and door openings on the northern, southern and eastern façades, exchange of locksmith elements, replacement of timber products and repair by construction of damaged rein...
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 12,102 bytes −899 Removed claim: summary (P836): The subject of the project is 197 building works in Stage II, leading to the achievement of energy savings of the current building and to ensure the repair of the non-compliant part of the façade. The insulation is hot, the insulation of soils, the exchange of window and door openings in the northern, southern and eastern façade, the replacement of the locksmith, the replacement of battery cages and the repair of the damaged paved surfaces. Af...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:2806:28, 27 February 2020DG Regio talk contribs 11,222 bytes +899 Created claim: summary (P836): The subject of the project is 197 building works in Stage II, leading to the achievement of energy savings of the current building and to ensure the repair of the non-compliant part of the façade. The insulation is hot, the insulation of soils, the exchange of window and door openings in the northern, southern and eastern façade, the replacement of the locksmith, the replacement of battery cages and the repair of the damaged paved surfaces. Afte...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020