Revision history of "BD Pod Hájem 304, King’s Court" (Q75343)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2721:27, 12 October 2024DG Regio talk contribs 50,338 bytes +3 Changed label, description and/or aliases in pt
  • curprev 21:2721:27, 12 October 2024DG Regio talk contribs 50,335 bytes +9 Set a claim value: summary (P836): O projeto contém uma casa isolada st. 573/1, 573/2 na aldeia de Králův Dvůr, distrito de Beroun. O projeto baseia-se no isolamento parcial das paredes do escudo e do telhado, completando o isolamento térmico de toda a envolvente do edifício. Está pronto para a redução de energia de acordo com os requisitos do IROP. O objetivo do projeto é reduzir os custos de aquecimento dos residentes da casa em convergência com o efeito de reduzir as emissões na R...

23 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 16:2516:25, 25 July 2022DG Regio talk contribs 49,182 bytes +28,755 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3601:36, 29 November 2021DG Regio talk contribs 14,136 bytes +1,500 Created claim: summary (P836): Le projet contient une maison individuelle st. 573/1, 573/2 à Králův Dvůr, district de Beroun. Le projet suit l’isolation partielle des murs de bouclier et des toits en complétant l’isolation thermique de toute l’enveloppe du bâtiment. Il est prêt pour la réduction d’énergie selon les exigences IROP. L’objectif du projet est de réduire les coûts de chauffage des résidents de la maison en convergence avec l’effet de réduire les émissions en Répub...
  • curprev 01:3601:36, 29 November 2021DG Regio talk contribs 12,636 bytes +90 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 12,995 bytes +92 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 12,903 bytes −91 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 12,994 bytes +1,466 Created claim: summary (P836): The project contains a detached house st. 573/1, 573/2 in the village Králův Dvůr, district Beroun. The project builds on partial insulation of the shield walls and roof by completing the thermal insulation of the entire building envelope. It is ready for energy reduction according to the IROP requirements. The aim of the project is to reduce the heating costs of residents of the house in convergence with the effect of reducing emissions in the...
  • curprev 22:1722:17, 23 October 2020DG Regio talk contribs 11,528 bytes −1,025 Removed claim: summary (P836): The content of the project is a free-standing house st. 573/1, 573/2 in the municipality of Králův Důr, province of Beroun. The project follows the insulation of the label walls and the roof by completing the thermal insulation of the entire building envelope. It is ready to reduce energy in line with the IROP requirements. The aim of the project is to reduce expenditure for heating the population of a building in convergence with the effect o...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:2906:29, 27 February 2020DG Regio talk contribs 10,775 bytes +1,025 Created claim: summary (P836): The content of the project is a free-standing house st. 573/1, 573/2 in the municipality of Králův Důr, province of Beroun. The project follows the insulation of the label walls and the roof by completing the thermal insulation of the entire building envelope. It is ready to reduce energy in line with the IROP requirements. The aim of the project is to reduce expenditure for heating the population of a building in convergence with the effect of...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020