Revision history of "Reduction of energy intensity of apartment building n. 898, Chodov" (Q75240)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2721:27, 12 October 2024DG Regio talk contribs 51,492 bytes +15 Set a claim value: summary (P836): O projeto tem por objeto alterações na construção do edifício de apartamentos Husova 989 em Chodov u Karlovy Vary, a fim de reduzir o desempenho energético do edifício. Para reduzir o desempenho energético do edifício, o isolamento de todas as paredes periféricas acima do nível do piso em 1NP até o nível da estrutura do telhado, a substituição dos painéis duplos de madeira existentes e as portas existentes para estruturas novas e do telhado são proj...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:1816:18, 25 July 2022DG Regio talk contribs 48,805 bytes +27,934 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3601:36, 29 November 2021DG Regio talk contribs 14,654 bytes +1,474 Created claim: summary (P836): Le sujet du projet est la construction du bâtiment de l’immeuble d’habitation Husova 989 dans la ville de Chodov près de Karlovy Vary, afin de réduire la performance énergétique du bâtiment. Afin de réduire la performance énergétique du bâtiment, il est conçu pour isoler tous les murs périphériques au-dessus du niveau du plancher en 1NP jusqu’au niveau de la structure du toit, en remplaçant les doubles remplissages en bois existants et les porte...
  • curprev 01:3601:36, 29 November 2021DG Regio talk contribs 13,180 bytes +149 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:0322:03, 23 October 2020DG Regio talk contribs 13,480 bytes +125 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:0322:03, 23 October 2020DG Regio talk contribs 13,355 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:0322:03, 23 October 2020DG Regio talk contribs 13,481 bytes +1,354 Created claim: summary (P836): The object of the project is construction modifications of the building of the Husova 989 apartment building in Chodov u Karlovy Vary, in order to reduce the energy performance of the building. To reduce the energy performance of the building, the insulation of all peripheral walls above the floor level in 1NP up to the roof structure level, the replacement of existing wooden double panels and existing doors for new and roof structures is design...
  • curprev 22:0322:03, 23 October 2020DG Regio talk contribs 12,127 bytes −888 Removed claim: summary (P836): The project is the building of the building of the apartment building Husova 989 in the city of Chodov with Karlovy Vary to reduce the energy intensity of the building. In order to reduce the energy intensity of the object, the insulation of all peripheral walls above the level of the floor in the 1-NP up to the level of the roof structure, the replacement of existing wooden fillers and the existing doors for new and roof structures shall be w...

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1306:13, 27 February 2020DG Regio talk contribs 11,227 bytes +888 Created claim: summary (P836): The project is the building of the building of the apartment building Husova 989 in the city of Chodov with Karlovy Vary to reduce the energy intensity of the building. In order to reduce the energy intensity of the object, the insulation of all peripheral walls above the level of the floor in the 1-NP up to the level of the roof structure, the replacement of existing wooden fillers and the existing doors for new and roof structures shall be war...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020