Revision history of "Revitalisation OF THE HOME Nábřeží 652, Postal Code 763 26 Luhačovice" (Q75235)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:1015:10, 13 October 2024DG Regio talk contribs 47,670 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:1015:10, 13 October 2024DG Regio talk contribs 47,671 bytes +2 Set a claim value: summary (P836): O projeto resolve a redução do desempenho energético do edifício de apartamentos graças à implementação das seguintes medidas:-Isolamento das paredes do perímetro dos pisos acima do solo,-O isolamento do teto 1. PP (supervisão da cave),-Troca de 2 pcs de janelas em unidades de apartamentos 4.NP,-Reparação geral e isolamento de varandas, – 2 pcs de novas varandas no lado JV do edifício de apartamentos.

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:1816:18, 25 July 2022DG Regio talk contribs 44,997 bytes +25,402 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3601:36, 29 November 2021DG Regio talk contribs 14,122 bytes +1,254 Created claim: summary (P836): Le projet résout la réduction de l’intensité énergétique de l’immeuble d’habitation grâce aux mesures suivantes:-Fermer les murs du périmètre des étages hors-sol,-Shattering du plafond 1. Pp (vue sous-sol),- Échange de 2 pcs de fenêtres dans les unités d’appartements 4.NP,-Réparation générale et isolation des balcons,-Maintenance de 2 pcs de nouveaux balcons sur le côté JV de l’immeuble d’appartements., translated_summary
  • curprev 01:3601:36, 29 November 2021DG Regio talk contribs 12,868 bytes +134 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:0222:02, 23 October 2020DG Regio talk contribs 13,183 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:0222:02, 23 October 2020DG Regio talk contribs 13,050 bytes −120 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:0222:02, 23 October 2020DG Regio talk contribs 13,170 bytes +1,256 Created claim: summary (P836): The project solves the reduction of the energy performance of the apartment building thanks to the implementation of the following measures:-Insulation of the perimeter walls of the above-ground floors,-The insulation of the ceiling 1. PP (supervision of the basement),-Exchange of 2 pcs of windows in apartment units 4.NP,-General repair and insulation of balconies, – 2 pcs of new balconies on the JV side of the apartment building., translated_su...
  • curprev 22:0222:02, 23 October 2020DG Regio talk contribs 11,914 bytes −772 Removed claim: summary (P836): The project addresses the reduction of the energy intensity of the building stock by means of the following measures: the insulation of the perimeter walls above the ground level, the insulation of the ceiling of 1. PP (basement), -Exchange of 2 windows in multi-apartment 4-NP, -overhaul and insulation of balconies, -replacement of 2ks of new balconies per JV on the side of the apartment building., remove_old_english_translation

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1306:13, 27 February 2020DG Regio talk contribs 10,910 bytes +772 Created claim: summary (P836): The project addresses the reduction of the energy intensity of the building stock by means of the following measures: the insulation of the perimeter walls above the ground level, the insulation of the ceiling of 1. PP (basement), -Exchange of 2 windows in multi-apartment 4-NP, -overhaul and insulation of balconies, -replacement of 2ks of new balconies per JV on the side of the apartment building., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020