Revision history of "Insulation of an apartment building in Chýnov, no. 467" (Q75196)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:1015:10, 13 October 2024DG Regio talk contribs 51,715 bytes +1 Changed label, description and/or aliases in pt
  • curprev 15:1015:10, 13 October 2024DG Regio talk contribs 51,714 bytes +2 Set a claim value: summary (P836): O projeto inclui o isolamento de um edifício de apartamentos com 14 unidades residenciais de pequena escala em Chýnov. Como parte da implementação do evento, será implementado o sistema de isolamento exterior do casco, incluindo o isolamento do teto, a instalação de novas janelas e portas de plástico, incluindo o isolamento dos trabalhos relacionados no exterior do edifício. A razão para a implementação do projeto é o esforço para reduzir o consumo...

22 March 2024

15 January 2024

6 July 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:1516:15, 25 July 2022DG Regio talk contribs 48,518 bytes +27,953 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3501:35, 29 November 2021DG Regio talk contribs 14,496 bytes +1,448 Created claim: summary (P836): Le contenu du projet est l’isolation d’un immeuble d’appartements avec 14 petits logements à Chýnov. Dans le cadre de la mise en œuvre de l’événement, un système d’isolation externe de gaine sera mis en place, y compris l’isolation du plafond, l’installation de nouvelles fenêtres et portes en plastique, y compris l’isolation des travaux connexes sur l’enveloppe extérieure du bâtiment. La raison du projet est de réduire la consommation d’énergie...
  • curprev 01:3501:35, 29 November 2021DG Regio talk contribs 13,048 bytes +103 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:0122:01, 23 October 2020DG Regio talk contribs 13,394 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:0122:01, 23 October 2020DG Regio talk contribs 13,280 bytes −112 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:0122:01, 23 October 2020DG Regio talk contribs 13,392 bytes +1,396 Created claim: summary (P836): The project includes insulation of an apartment building with 14 small-scale residential units in Chýnov. As part of the implementation of the event, the external shell insulation system will be implemented, including the ceiling insulation, the installation of new plastic windows and doors, including the insulation of related work on the exterior of the building. The reason for the implementation of the project is the effort to reduce the heat...
  • curprev 22:0122:01, 23 October 2020DG Regio talk contribs 11,996 bytes −940 Removed claim: summary (P836): The project covers the insulation of the apartment building with a 14-ti retail apartment block in Chýnová. As part of the implementation of the action, the insulation system of the outer shell will be carried out, including the insulation of the ceiling, the fitting out of new plastic windows and doors, including a call for work on the outside envelope of the building. The reason for the project is to try to reduce the consumption of the fiel...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1306:13, 27 February 2020DG Regio talk contribs 11,158 bytes +940 Created claim: summary (P836): The project covers the insulation of the apartment building with a 14-ti retail apartment block in Chýnová. As part of the implementation of the action, the insulation system of the outer shell will be carried out, including the insulation of the ceiling, the fitting out of new plastic windows and doors, including a call for work on the outside envelope of the building. The reason for the project is to try to reduce the consumption of the field...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020