Revision history of "II/420 Lower Věstonice delay and bridge 420-012" (Q75131)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,360 bytes +6 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,354 bytes −4 Set a claim value: summary (P836): O objetivo do projeto é a reconstrução da estrada II/420 no atraso das aldeias Dolní Věstonice e a reconstrução da ponte n.o 420-012 no troço de extravagância subsequente. O troço reconstruído da estrada começa no arco direcional em frente à ponte n.o 420-012 e termina atrás da aldeia perto de DZ IZ4b em direção a Mikulov. O comprimento total da reconstrução da estrada II/420 é de 0,866 km. A secção pertinente da comunicação faz parte da rede rodovi...

22 March 2024

15 January 2024

19 June 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 16:1016:10, 25 July 2022DG Regio talk contribs 47,662 bytes +27,955 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3801:38, 29 November 2021DG Regio talk contribs 13,567 bytes +1,443 Created claim: summary (P836): L’objet du projet est la reconstruction de la route II/420 dans l’extension des villages Dolní Věstonice et la reconstruction du pont no 420-012 dans le tronçon de liaison extravilan. La partie reconstruite de la route commence par l’arc directionnel devant le pont no 420-012 et se termine après le village près de l’extrémité DZ IZ4b du village vers Mikulov. La longueur totale de la reconstruction de la route II/420 est de 0,866 km. La section d...
  • curprev 01:3801:38, 29 November 2021DG Regio talk contribs 12,124 bytes +110 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:4221:42, 23 October 2020DG Regio talk contribs 12,463 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:4221:42, 23 October 2020DG Regio talk contribs 12,356 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:4221:42, 23 October 2020DG Regio talk contribs 12,458 bytes +1,408 Created claim: summary (P836): The object of the project is the reconstruction of road II/420 in the delay of the villages Dolní Věstonice and reconstruction of the bridge No. 420-012 in the subsequent extravaganza section. The reconstructed section of the road begins in the directional arch in front of the bridge no. 420-012 and ends behind the village near DZ IZ4b towards Mikulov. The total length of the reconstruction of road II/420 is 0.866 km. The relevant section of the...
  • curprev 21:4221:42, 23 October 2020DG Regio talk contribs 11,050 bytes −970 Removed claim: summary (P836): The purpose of the project is the reconstruction of the II/420 road in the growth of the municipalities of Lower Prison and the reconstruction of the Ev. 420-012 bridge in the downstream extraction sector. The reconstructed section of the communication begins in the direction of the arc ahead of the bridge 420-012 and ends with the municipality of DZ IZ4b in the direction of Mikulov. The total length of the II/420 road is 0.866 km. The underly...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3006:30, 27 February 2020DG Regio talk contribs 10,239 bytes +970 Created claim: summary (P836): The purpose of the project is the reconstruction of the II/420 road in the growth of the municipalities of Lower Prison and the reconstruction of the Ev. 420-012 bridge in the downstream extraction sector. The reconstructed section of the communication begins in the direction of the arc ahead of the bridge 420-012 and ends with the municipality of DZ IZ4b in the direction of Mikulov. The total length of the II/420 road is 0.866 km. The underlyin...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020