Revision history of "III/21217 Modernisation of the road Františkovy Lázně – Třebeň, section 1" (Q75012)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2521:25, 12 October 2024DG Regio talk contribs 46,372 bytes 0 Changed label, description and/or aliases in pt
  • curprev 21:2521:25, 12 October 2024DG Regio talk contribs 46,372 bytes +8 Set a claim value: summary (P836): A construção trata da reconstrução do trecho intravilano e extravilano da estrada III/212 17 na construção das aldeias Aleje e Horní Ves no comprimento de 1,00 km. No âmbito da reconstrução, a comunicação será homogeneizada para a categoria MO2 10/7,0/40, a drenagem, a marcação vertical e horizontal serão restabelecidas e serão estabelecidas zonas de paragem de autocarros.

20 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 16:0216:02, 25 July 2022DG Regio talk contribs 44,437 bytes +24,944 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 14,081 bytes +1,240 Created claim: summary (P836): La construction résout la reconstruction du tronçon intravilan et extravilan de la route III/212 17 dans la construction des municipalités d’Aleje et Horní Ves sur une longueur de 1,00 km. Dans le cadre de la reconstruction, la route sera homogénéisée sur la catégorie MO2 10/7.0/40, le drainage, les marquages verticaux et horizontaux seront restaurés et des baies d’arrêt d’autobus seront établies., translated_summary
  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 12,841 bytes +139 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:4722:47, 23 October 2020DG Regio talk contribs 13,151 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:4722:47, 23 October 2020DG Regio talk contribs 13,012 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:4722:47, 23 October 2020DG Regio talk contribs 13,144 bytes +1,203 Created claim: summary (P836): The construction deals with the reconstruction of the intravilan and extravilan section of road III/212 17 in the construction of the villages Aleje and Horní Ves in the length of 1.00 km. As part of the reconstruction, the communication will be homogenised to category MO2 10/7,0/40, drainage, vertical and horizontal marking will be restored and bus stop bays will be established., translated_summary
  • curprev 22:4622:46, 23 October 2020DG Regio talk contribs 11,941 bytes −748 Removed claim: summary (P836): The construction deals with the reconstruction of the intrvilad and the extravar section of the III/212 17 road in built-up areas of the aleje and Horní Ves at a length of 1.00 km. The reconstruction process will result in the homogenisation of the communication on the MO2 10/7,0/40 category, restoring drainage, vertical and horizontal markings and setting up bus stops., remove_old_english_translation

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:2206:22, 27 February 2020DG Regio talk contribs 10,913 bytes +748 Created claim: summary (P836): The construction deals with the reconstruction of the intrvilad and the extravar section of the III/212 17 road in built-up areas of the aleje and Horní Ves at a length of 1.00 km. The reconstruction process will result in the homogenisation of the communication on the MO2 10/7,0/40 category, restoring drainage, vertical and horizontal markings and setting up bus stops., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020