Revision history of "II/115 Černošice, road reconstruction" (Q74960)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,291 bytes −19 Set a claim value: summary (P836): O objetivo do projeto é reconstruir a seção do II. Estrada de classe em Černošice com um comprimento de 2158 m. Trata-se de uma reconstrução de uma estrada importante, que serve de ligação a D4 e D5, incluindo as camadas subjacentes da estrada existente, respeitando a sua atual solução de direção e altitude. A estrada removerá falhas e aumentará a capacidade de carga. Simultaneamente, proceder-se-á à reconstrução dos esgotos pluviais, à relocalizaçã...

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5815:58, 25 July 2022DG Regio talk contribs 48,126 bytes +27,922 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 14,015 bytes +1,471 Created claim: summary (P836): L’objectif du projet est la reconstruction d’un tronçon de la route II. classe Černošice d’une longueur de 2 158 m. Il s’agit d’une reconstruction d’une route importante, qui sert de raccordement à D4 et D5, y compris les couches de base de la route existante tout en respectant sa solution directionnelle et en hauteur actuelle. La chaussée éliminera les défaillances et augmentera la capacité de charge. Dans le même temps, la reconstruction du ré...
  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 12,544 bytes +104 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:4522:45, 23 October 2020DG Regio talk contribs 12,889 bytes +98 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:4522:45, 23 October 2020DG Regio talk contribs 12,791 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:4522:45, 23 October 2020DG Regio talk contribs 12,896 bytes +1,387 Created claim: summary (P836): The aim of the project is to reconstruct the section of the II. Class road in Černošice with a length of 2158 m. It is a reconstruction of an important road, which serves as a connection to D4 and D5, including the underlying layers of the existing road while respecting its current directional and altitude solution. The road will remove faults and increase the load capacity. At the same time, a reconstruction of the rain sewerage, water supply r...
  • curprev 22:4522:45, 23 October 2020DG Regio talk contribs 11,509 bytes −956 Removed claim: summary (P836): The project aims at the reconstruction of a section of the Class II road in the Black Sea area of 2 158 m. Jde, on the reconstruction of a major road that serves as a connection to D4 and D5, including the underlying layers of an existing communication while respecting both its current orientation and the level solution. The road will be damaged and there will be an increase in the load capacity. At the same time, a reconstruction of the storm...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:2106:21, 27 February 2020DG Regio talk contribs 10,693 bytes +956 Created claim: summary (P836): The project aims at the reconstruction of a section of the Class II road in the Black Sea area of 2 158 m. Jde, on the reconstruction of a major road that serves as a connection to D4 and D5, including the underlying layers of an existing communication while respecting both its current orientation and the level solution. The road will be damaged and there will be an increase in the load capacity. At the same time, a reconstruction of the storm w...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020