Revision history of "II/432 Kyjov – Milotice – Ratíškovice" (Q74943)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 44,957 bytes 0 Changed label, description and/or aliases in pt
  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 44,957 bytes +5 Set a claim value: summary (P836): O projeto tem por objeto a reconstrução da estrada II/432 em dois troços Kyjov – Milotice e Milotice – Ratíškovice, com um comprimento total de 7,155 km. A secção pertinente da comunicação faz parte da rede rodoviária regional prioritária, definida de acordo com os critérios estabelecidos no documento de programação do IROP.

12 March 2024

15 January 2024

19 June 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5715:57, 25 July 2022DG Regio talk contribs 42,280 bytes +23,493 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 13,787 bytes +1,155 Created claim: summary (P836): L’objet du projet est la reconstruction de la route II/432 en deux sections Kyjov — Milotice et Milotice — Ratíškovice d’une longueur totale de 7,155 km. La section de la route en question fait partie du réseau routier régional prioritaire, défini conformément aux critères énoncés dans le document du programme IROP., translated_summary
  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 12,632 bytes +102 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:4522:45, 23 October 2020DG Regio talk contribs 12,979 bytes +102 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:4522:45, 23 October 2020DG Regio talk contribs 12,877 bytes −100 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:4522:45, 23 October 2020DG Regio talk contribs 12,977 bytes +1,146 Created claim: summary (P836): The object of the project is the reconstruction of road II/432 in two sections Kyjov – Milotice and Milotice – Ratíškovice with a total length of 7.155 km. The relevant section of the communication is part of the Priority Regional Road Network, defined according to the criteria set out in the IROP Programming Document., translated_summary
  • curprev 22:4522:45, 23 October 2020DG Regio talk contribs 11,831 bytes −694 Removed claim: summary (P836): The project aims at the reconstruction of road II/432 in two stretches of Kyjov — Milotice and Milotice — Ríšovškovice, over a total length of 7.155 km. The underlying section of the communication is part of the priority regional road network defined in accordance with the criteria in the IROP Programme Document., remove_old_english_translation

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3406:34, 27 February 2020DG Regio talk contribs 10,738 bytes +694 Created claim: summary (P836): The project aims at the reconstruction of road II/432 in two stretches of Kyjov — Milotice and Milotice — Ríšovškovice, over a total length of 7.155 km. The underlying section of the communication is part of the priority regional road network defined in accordance with the criteria in the IROP Programme Document., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020