Revision history of "Bridge no. no. 163-024 behind Higher Brod" (Q74893)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 45,508 bytes −2 Changed label, description and/or aliases in pt
  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 45,510 bytes −2 Set a claim value: summary (P836): O projeto inclui a reconstrução da ponte do ponto de vista técnico, quando a ponte existente será demolida, a nova na posição existente, a modificação da estrada nos campos anteriores da ponte e a modificação da calha e das margens do córrego em torno da ponte. A modificação global da comunicação é projetada em um comprimento de cerca de 189 m.

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5315:53, 25 July 2022DG Regio talk contribs 42,841 bytes +23,714 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 13,881 bytes +1,214 Created claim: summary (P836): Le contenu du projet est du point de vue technique la reconstruction du pont, lorsque le pont existant sera démoli, la construction d’un nouveau pont dans la position existante, la modification de la route à la périphérie du pont et la modification du creux et des rives du cours d’eau autour du pont. La modification globale de la route est conçue sur une longueur d’environ 189 m., translated_summary
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 12,667 bytes +105 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,011 bytes +100 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 12,911 bytes −100 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,011 bytes +1,213 Created claim: summary (P836): The project includes the reconstruction of the bridge from a technical point of view, when the existing bridge will be demolished, the new one in the existing position, the modification of the road in the forefields of the bridge and modification of the trough and the banks of the stream around the bridge. The overall modification of the communication is designed in a length of about 189 m., translated_summary
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 11,798 bytes −788 Removed claim: summary (P836): The content of the project is from the technical point of view of the reconstruction of the bridge, when the existing bridge is being demolished, the construction of the new position in the current location, the modification of the communication in the prefixes of the bridge and the modification of the channel and the banks of the harness around the bridge. The overall layout of the communication is about 189 m., remove_old_english_translation

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 10,799 bytes +788 Created claim: summary (P836): The content of the project is from the technical point of view of the reconstruction of the bridge, when the existing bridge is being demolished, the construction of the new position in the current location, the modification of the communication in the prefixes of the bridge and the modification of the channel and the banks of the harness around the bridge. The overall layout of the communication is about 189 m., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020