Revision history of "II/115 Rooster, delay" (Q74891)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0915:09, 13 October 2024DG Regio talk contribs 51,422 bytes +13 Set a claim value: summary (P836): O projecto tem por objecto a reconstrução do troço de uma estrada seleccionada da classe II (II/115) em Řevnice, com um comprimento total de 367 m, incluindo soluções de drenagem. Secção II/115 (ul. Pražská) inclui a substituição das camadas abrasivas, a ampliação da estrutura, a melhoria das camadas estruturais subjacentes, a capacidade da faixa de drenagem com a instalação de novos freios ao longo da calçada para direcionar a água da chuva da estr...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5315:53, 25 July 2022DG Regio talk contribs 48,738 bytes +28,068 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,509 bytes +1,476 Created claim: summary (P836): L’objet du projet est la reconstruction d’un tronçon de la route II sélectionnée (II/115) à 'evnice d’une longueur totale de 367 m, y compris les solutions de drainage. Section II/115 (ul. Pražská) comprend le remplacement d’une couche abrasive, la construction renforcée, l’amélioration des couches de sous-structure, la capacité de la bande de drainage avec l’installation de nouvelles bordures le long du trottoir pour diriger l’eau de pluie de l...
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 13,033 bytes +81 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,401 bytes +80 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,321 bytes −80 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,401 bytes +1,421 Created claim: summary (P836): The object of the project is the reconstruction of the section of a selected II.class road (II/115) in Řevnice with a total length of 367 m, including drainage solutions. Section II/115 (ul. Pražská) includes the replacement of the abrasive layers, amplification of the structure, improvement of the underlying structural layers, capacity of the drainage strip with the fitting of new curbs along the sidewalk to direct the rainwater from the road a...
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 11,980 bytes −964 Removed claim: summary (P836): The project aims at the reconstruction of a section selected by Class II (II/115) in Regensburg, with a total length of 367 m, including through drainage. Section II/115 (ul. “Pražská”) involves the exchange of a layer, a reinforcement of the structure, an improvement of the substructure, the capacity of drainage of the drainage strip with the formation of new roubles along the pavement to control the ground waters from the ground and the trea...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,159 bytes +964 Created claim: summary (P836): The project aims at the reconstruction of a section selected by Class II (II/115) in Regensburg, with a total length of 367 m, including through drainage. Section II/115 (ul. “Pražská”) involves the exchange of a layer, a reinforcement of the structure, an improvement of the substructure, the capacity of drainage of the drainage strip with the formation of new roubles along the pavement to control the ground waters from the ground and the treatm...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020