Revision history of "Road II/487: Huslenky, transit section" (Q74890)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 50,450 bytes +10 Set a claim value: summary (P836): O objetivo do projeto é a modificação da construção da estrada II/487 na aldeia de Huslenky no comprimento total de 1703 m. A largura da estrada é projetada na categoria MO 8.0/50 com extensão local em curvas direcionais. A estrada será reconstruída, a largura da estrada é modificada (unificação), a nova drenagem rodoviária e a construção de uma nova rede de esgotos, a construção de duas novas pontes no local das pontes existentes, a reconstrução de...

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 15:5315:53, 25 July 2022DG Regio talk contribs 48,514 bytes +27,860 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,608 bytes +1,456 Created claim: summary (P836): L’objet du projet est la construction de la route II/487 dans le village intravilan de Huslenky d’une longueur totale de 1 703 m. La largeur de la route est conçue dans la catégorie MO 8.0/50 avec une expansion locale en courbes directionnelles. La route sera reconstruite, (unification) de la largeur de la route, le nouveau drainage routier et la construction d’un nouveau réseau d’égouts, la construction de deux nouveaux ponts sur le site de l’a...
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 13,152 bytes +101 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,500 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,403 bytes −94 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,497 bytes +1,427 Created claim: summary (P836): The object of the project is the construction modification of road II/487 in the village of Huslenky in total length 1703 m. The road width is designed in category MO 8.0/50 with local extension in directional curves. The road will be reconstructed, the road width is modified (unification), the new road drainage and the construction of a new sewerage, the construction of two new bridges on the site of existing bridges, the reconstruction of thre...
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 12,070 bytes −1,010 Removed claim: summary (P836): The purpose of the project is the construction of the II/487 road in the municipality of Humslovka, over a total length of 1 703 m. the width of the road is proposed in the category MO 8,0/50 with the local extension in the direction of the direction arch. There will be a reconstruction of the road, the modification (alignment) of the road width, new drainage of the road and the construction of a new sewer, the construction of two new bridges...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,292 bytes +1,010 Created claim: summary (P836): The purpose of the project is the construction of the II/487 road in the municipality of Humslovka, over a total length of 1 703 m. the width of the road is proposed in the category MO 8,0/50 with the local extension in the direction of the direction arch. There will be a reconstruction of the road, the modification (alignment) of the road width, new drainage of the road and the construction of a new sewer, the construction of two new bridges on...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020