Revision history of "II/373 Chudobín – delay" (Q74887)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5315:53, 25 July 2022DG Regio talk contribs 39,991 bytes +21,887 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 13,495 bytes +1,102 Created claim: summary (P836): La construction résout la modification existante de la route, qui est en mauvais état de construction. Dans le même temps, les tronçons d’égouts présentant des fissures longitudinales et des profilés effondrés seront adaptés pour assurer un drainage adéquat de la route., translated_summary
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 12,393 bytes +86 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 12,756 bytes +85 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 12,671 bytes −84 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 12,755 bytes +1,059 Created claim: summary (P836): The building deals with the existing modification of the road, which is in poor building condition. At the same time, sewer sections with longitudinal cracks and collapsed profiles will be modified for proper drainage of the communication., translated_summary
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 11,696 bytes −627 Removed claim: summary (P836): The construction works to address the existing provisions of the communication, which is in the poor construction state. At the same time, sewer sections with longitudinal cracks and failed profiles for proper drainage of communications will be regulated., remove_old_english_translation

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 10,536 bytes +627 Created claim: summary (P836): The construction works to address the existing provisions of the communication, which is in the poor construction state. At the same time, sewer sections with longitudinal cracks and failed profiles for proper drainage of communications will be regulated., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020