Revision history of "Road III/49016: Zlin, bridge no. 49016-2" (Q74880)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,340 bytes −2 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,342 bytes +9 Set a claim value: summary (P836): O objetivo do projeto é a reconstrução da ponte n.o 49016-2 (passagem superior na estação rodoviária), incluindo a estrada nela existente e a estrada III/49016 no nó da secção n.o 2 «Nadjezd», n.o da tenda km 0,205-0,659. O comprimento total da modificação da construção da estrada III/49016, incluindo a ponte, é de 454 m, sendo o comprimento da ponte de 196,6 m, incluindo as secções de cruzamento de 206 m. A reconstrução da ponte ev. O n.o 49016-2 c...

7 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 15:5215:52, 25 July 2022DG Regio talk contribs 49,409 bytes +28,486 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 14,640 bytes +1,482 Created claim: summary (P836): L’objet du projet est la reconstruction du pont no 49016-2 (passage supérieur à la gare routière), y compris la route sur celle-ci et la route III/49016 dans la jonction no 2 «Overpass», tente de nœud. km 0,205-0.659. La longueur totale de la construction de la route III/49016 y compris le pont est de 454 m, dont la longueur du pont est de 196,6 m, y compris les sections de passage à niveau 206 m. La reconstruction du pont no 49016-2 consistera...
  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 13,158 bytes +98 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,509 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,410 bytes −102 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 13,512 bytes +1,456 Created claim: summary (P836): The object of the project is the reconstruction of the bridge No. 49016-2 (overpass at the bus station) including the road on it and road III/49016 in the node section No. 2 “Nadjezd”, no. tent km 0,205-0,659. The total length of the construction modification of road III/49016, including the bridge is 454 m, of which the bridge length is 196.6 m, incl. crossing sections 206 m. The reconstruction of the bridge ev. No. 49016-2 will consist of the...
  • curprev 22:2522:25, 23 October 2020DG Regio talk contribs 12,056 bytes −754 Removed claim: summary (P836): The purpose of the project is the reconstruction of the bridge between 49016 and 2 (in the case of the bus station), including the communication on it and the III/49016 road in the 2- hub, respectively km 0,205-0,659. The total length of the construction of the road III/49016, including the bridge, is 454 m, of which bridge length is 196.6 m, incl. transitional sections 206 m., remove_old_english_translation

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,019 bytes +754 Created claim: summary (P836): The purpose of the project is the reconstruction of the bridge between 49016 and 2 (in the case of the bus station), including the communication on it and the III/49016 road in the 2- hub, respectively km 0,205-0,659. The total length of the construction of the road III/49016, including the bridge, is 454 m, of which bridge length is 196.6 m, incl. transitional sections 206 m., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020