Revision history of "II/426 Bzenec Přívoz – Strážnice, I/55" (Q74870)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 49,184 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 49,184 bytes −1 Set a claim value: summary (P836): O objetivo do projeto é reconstruir a estrada II/426 no troço Bzenec – Strážnice, I/55 e melhorar o estado da estrada e das pontes localizadas no itinerário em causa. A reconstrução aumentará a segurança e a suavidade do transporte e prolongará a vida útil dos edifícios de pontes. A execução do projeto melhorará os parâmetros técnicos da comunicação e das pontes. A reconstrução é projetada na rota existente II/426, a integração da construção no terr...

22 March 2024

15 January 2024

12 June 2023

20 February 2023

17 February 2023

25 July 2022

  • curprev 15:5115:51, 25 July 2022DG Regio talk contribs 47,256 bytes +26,934 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 14,440 bytes +1,394 Created claim: summary (P836): L’objectif du projet est de reconstruire la route II/426 dans le tronçon Bzenec — Strážnice, I/55 et d’améliorer l’état de la route et des ponts situés sur la route. La reconstruction améliorera la sécurité et la fluidité de la circulation et prolongera la durée de vie des bâtiments du pont. La mise en œuvre du projet améliorera les paramètres techniques de la communication et des ponts. La reconstruction est conçue sur l’itinéraire existant de...
  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 13,046 bytes +98 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,397 bytes +103 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,294 bytes −97 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,391 bytes +1,374 Created claim: summary (P836): The aim of the project is to reconstruct road II/426 in the section Bzenec – Strážnice, I/55 and improve the state of the road and bridges that are located on the given route. The reconstruction will increase the safety and smoothness of transport and extend the service life of bridge buildings. The implementation of the project will improve the technical parameters of communication and bridges. The reconstruction is designed on the existing ro...
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 12,017 bytes −912 Removed claim: summary (P836): The project aims at the reconstruction of the II/426 road in Bzenec — Strážnice, I/55 and the improvement of the state of communication and of the bridges present on the route. The reconstruction works to improve the safety and flow of transport and to extend the lifespan of bridges of arms. The implementation of the project will improve the technical parameters of communication and bridges. Reconstruction is proposed in the existing road II/...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,147 bytes +912 Created claim: summary (P836): The project aims at the reconstruction of the II/426 road in Bzenec — Strážnice, I/55 and the improvement of the state of communication and of the bridges present on the route. The reconstruction works to improve the safety and flow of transport and to extend the lifespan of bridges of arms. The implementation of the project will improve the technical parameters of communication and bridges. Reconstruction is proposed in the existing road II/42...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020