Revision history of "Bridge no. 145-031 Husinec" (Q74869)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 50,146 bytes −2 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 50,148 bytes −10 Set a claim value: summary (P836): O conteúdo do projeto é de um ponto de vista técnico a reconstrução da ponte, onde a intenção da construção é remover antigas bordas de concreto e estradas, fornecer uma estrutura de apoio com novo isolamento, novas bordas de concreto, reparar a estrutura inferior e fazer uma mudança de ajuste para que no pé n.o 2 haja um ajuste fixo com um fechamento de ponte subsuperficial e no suporte n.o 1 ajuste deslizante longitudinal com acabamento de ponte d...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5115:51, 25 July 2022DG Regio talk contribs 47,486 bytes +27,069 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 14,416 bytes +1,458 Created claim: summary (P836): Le contenu du projet est, d’un point de vue technique, la reconstruction du pont, où l’intention de la construction est d’enlever les vieilles corniches en béton et les routes, de fournir à la structure de support une nouvelle isolation, de nouvelles corniches en béton, de réparer la structure inférieure et de modifier l’arrimage de manière à ce que sur le support no 2 il y ait une position fixe avec une fermeture du pont souterrain et sur le su...
  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 12,958 bytes +82 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,325 bytes +85 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,240 bytes −84 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,324 bytes +1,378 Created claim: summary (P836): The content of the project is from a technical point of view the reconstruction of the bridge, where the intention of the construction is to remove old concrete ledges and roadways, to provide a supporting structure with new insulation, new concrete ledges, to repair the lower structure and to make a change of fit so that on the foot no. 2 there is a fixed fit with a subsurface bridge closure and on the support No. 1 longitudinally sliding fit w...
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 11,946 bytes −873 Removed claim: summary (P836): The content of the project is, from the technical point of view of the construction of the bridge, when the building project is intended to remove old concrete plants and roads, to equip the structure with new insulation, to repair the lower construction and to alter the deposit so as to make it a fixed deposit with a surface area close to the ground and no 1 longitudinally away from a surface area with a surface area. The total adjustment to...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,033 bytes +873 Created claim: summary (P836): The content of the project is, from the technical point of view of the construction of the bridge, when the building project is intended to remove old concrete plants and roads, to equip the structure with new insulation, to repair the lower construction and to alter the deposit so as to make it a fixed deposit with a surface area close to the ground and no 1 longitudinally away from a surface area with a surface area. The total adjustment to th...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020