Revision history of "Bridge No. 135-008 The Patriarchate" (Q74856)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 50,209 bytes −2 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 50,211 bytes +19 Set a claim value: summary (P836): O projeto inclui a modernização da ponte n.o 135-008 sobre o ribeiro de Bechyňský e, na sua sequência, do troço da estrada II/135 com 75 metros de comprimento. O projeto deve ser executado devido às más condições técnicas da ponte e à segurança reduzida dos transportes. A solução técnica é a demolição completa da ponte em ruínas existente e a construção de uma nova ponte. O edifício está localizado na intravilan da aldeia de Vlastiboř e a sua import...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5015:50, 25 July 2022DG Regio talk contribs 47,520 bytes +27,080 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,412 bytes +1,423 Created claim: summary (P836): Le contenu du projet est la modernisation du pont 135-008 sur le Bechyňský potok et le long du tronçon de la route II/135 d’une longueur de 75 mètres. Le projet doit être mis en œuvre en raison du mauvais état technique du pont et de la réduction de la sécurité des transports. La solution technique est la démolition complète du pont dilapidé existant et la construction d’un nouveau pont. Le bâtiment est situé dans l’intravilan du village de Vlas...
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 12,989 bytes +85 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,357 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,263 bytes −73 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,336 bytes +1,383 Created claim: summary (P836): The project includes modernisation of the bridge No. 135-008 over the Bechyňský creek and following it the section of road II/135 in length 75 metres. The project must be implemented due to poor technical condition of the bridge and reduced transport safety. The technical solution is the complete demolition of the existing dilapidated bridge and the construction of a new bridge. The building is located in the intravilan of the village Vlastiboř...
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 11,953 bytes −958 Removed claim: summary (P836): The project aims at the upgrading of the Ev. 135-008 bridge, through the Bech stream and passing through the II/135 road section over a length of 75 metres. The project needs to be implemented due to the poor technical condition of the bridge and reduced traffic safety. The technical solution is the complete demolition of the current dilapidated bridge and the construction of the new bridge. The building is located in the municipality of Vlast...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,137 bytes +958 Created claim: summary (P836): The project aims at the upgrading of the Ev. 135-008 bridge, through the Bech stream and passing through the II/135 road section over a length of 75 metres. The project needs to be implemented due to the poor technical condition of the bridge and reduced traffic safety. The technical solution is the complete demolition of the current dilapidated bridge and the construction of the new bridge. The building is located in the municipality of Vlastib...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020