Revision history of "II/308 HK, Slatina – border of Rychnov n/Kněžnou district, 1st stage" (Q74854)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 51,305 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 51,306 bytes −16 Set a claim value: summary (P836): O projeto trata da reconstrução da comunicação de classe II n.o 308 em duas secções (edifícios). A construção 1 no troço Slatina (HK)-Černilov inclui a parte extravilan da estrada e a reconstrução da ponte ev. No. 308-002 e Stavba 2 inclui um intravilan da aldeia Černilov. O comprimento total da estrada reconstruída é de 3,512 km. O troço reconstruído situa-se na rede prioritária IROP selecionada. O projeto melhorará a mobilidade regional e o desenv...

20 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5015:50, 25 July 2022DG Regio talk contribs 48,650 bytes +27,785 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,596 bytes +1,467 Created claim: summary (P836): Le projet résout la reconstruction de la communication no 308 de la classe II en deux sections (constructions). La construction 1 dans le tronçon Slatina (HK) — Černilov comprend la partie extravilienne de la route et la reconstruction du pont no 308-002 et la construction 2 comprend l’intravilan du village de Černilov. La longueur totale de la route reconstruite est de 3,512 km.La section reconstruite est située sur le réseau prioritaire sélect...
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 13,129 bytes +138 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,444 bytes +131 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,313 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,422 bytes +1,374 Created claim: summary (P836): The project deals with the reconstruction of Class II communication No. 308 in two sections (buildings). Construction 1 in the section Slatina (HK)-Černilov includes the extravilan part of the road and reconstruction of the bridge ev. No. 308-002 and Stavba 2 includes an intravilan of the village Černilov. The total length of the reconstructed road is 3.512 km.The reconstructed section is located on the selected IROP priority network. The projec...
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 12,048 bytes −986 Removed claim: summary (P836): The project deals with Class 308 reconstruction of Class in two sections (construction sites). Construction 1 in the section Slatina (HK) — Cernilov includes the extravagant part of the communication and the reconstruction of the bridge between the ages 308-002 and Stavba 2 includes the municipalities of Cernilov. The total length of the reconstructed communication is 3.512 km. the planned section is located on a selected priority network of I...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,247 bytes +986 Created claim: summary (P836): The project deals with Class 308 reconstruction of Class in two sections (construction sites). Construction 1 in the section Slatina (HK) — Cernilov includes the extravagant part of the communication and the reconstruction of the bridge between the ages 308-002 and Stavba 2 includes the municipalities of Cernilov. The total length of the reconstructed communication is 3.512 km. the planned section is located on a selected priority network of IRO...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020