Revision history of "Traffic junction of roads II/141 and II/145 Husinec – Běleč" (Q74852)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 47,447 bytes −3 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 47,450 bytes −1 Set a claim value: summary (P836): O projeto inclui a reconstrução da intersecção existente das estradas II/141 e II/145 perto de Prachatice até à intersecção das estradas circulares. O novo entroncamento reduzirá, em especial, a velocidade do trânsito de veículos, o fluxo de tráfego mais elevado e o consequente aumento da segurança rodoviária no troço resolvido de estradas de classe II na rede rodoviária da região da Boémia do Sul.

12 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5015:50, 25 July 2022DG Regio talk contribs 44,779 bytes +25,147 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,029 bytes +1,265 Created claim: summary (P836): Le contenu du projet est la reconstruction de l’intersection existante des routes II/141 et II/145 près de Prachatice à l’intersection de la rocade. La nouvelle jonction permettra, en particulier, de réduire la vitesse de passage des véhicules, d’augmenter le flux de trafic et l’augmentation résultante de la sécurité des transports dans le tronçon résolu de la classe II sur le réseau routier de la Région de Bohême du Sud., translated_summary
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 12,764 bytes +113 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,104 bytes +122 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 12,982 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,095 bytes +1,204 Created claim: summary (P836): The project includes the reconstruction of the existing intersection of roads II/141 and II/145 near Prachatice to the intersection of the circular roads. The new junction will, in particular, reduce the speed of vehicle transit, higher traffic flow and the resulting increase in traffic safety in the solved section of Class II roads on the road network of the South Bohemian Region., translated_summary
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 11,891 bytes −790 Removed claim: summary (P836): The content of the project is the conversion of an existing level crossing of the roads II/141 and II/145 close to the junction on the junction of the hub. In particular, the new intersection will make it possible to reduce the speed of the vehicles, increase the fluidity of transport and the resulting increase in traffic safety in the case of the Class II road section of the South Bohemian Region’s road network., remove_old_english_translation

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 10,902 bytes +790 Created claim: summary (P836): The content of the project is the conversion of an existing level crossing of the roads II/141 and II/145 close to the junction on the junction of the hub. In particular, the new intersection will make it possible to reduce the speed of the vehicles, increase the fluidity of transport and the resulting increase in traffic safety in the case of the Class II road section of the South Bohemian Region’s road network., Adding English summary

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020