Revision history of "Bridge No. 137-014 Švehlův in Tábor" (Q74851)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,623 bytes −2 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,625 bytes +28 Set a claim value: summary (P836): O projeto inclui uma reconstrução da ponte n.o 137-014 sobre o rio Lužnice e o troço da estrada II/137 que se lhe segue. O projeto deve ser executado devido às más condições técnicas da ponte e à segurança reduzida dos transportes. A solução técnica é a remediação da estrutura de apoio e da estrutura inferior e a substituição completa da estrada, saliências, corrimãos, calçadas, drenagem e fechamentos de pontes. O edifício está localizado em uma par...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5015:50, 25 July 2022DG Regio talk contribs 48,926 bytes +28,117 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,588 bytes +1,495 Created claim: summary (P836): Le contenu du projet est la reconstruction du pont e. No.137-014 au-dessus de la rivière Lužnice et le long du tronçon de la route II/137. Le projet doit être mis en œuvre en raison du mauvais état technique du pont et de la réduction de la sécurité des transports. La solution technique est l’assainissement de la structure de support et la construction inférieure et le remplacement complet de la route, des corniches, des garde-corps, des trottoi...
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 13,093 bytes +94 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,452 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,355 bytes −93 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,448 bytes +1,425 Created claim: summary (P836): The project includes a reconstruction of the bridge e.no.137-014 over the Lužnice River and the section of road II/137 after it. The project must be implemented due to poor technical condition of the bridge and reduced transport safety. The technical solution is the remediation of the supporting structure and the lower structure and the complete replacement of the road, ledges, railings, sidewalks, drainage and bridge closures. The building is l...
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 12,023 bytes −983 Removed claim: summary (P836): The project content is the reconstruction of the bridge.137-014 across the River Lužnice and the stretch passing through the II/137 communication section. The project needs to be implemented due to the poor technical condition of the bridge and reduced traffic safety. The technical solution is to clean up the structure and the ground structure and to complete the road, say, railings, pavements, drainage and mock conclusions. The building is bu...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,226 bytes +983 Created claim: summary (P836): The project content is the reconstruction of the bridge.137-014 across the River Lužnice and the stretch passing through the II/137 communication section. The project needs to be implemented due to the poor technical condition of the bridge and reduced traffic safety. The technical solution is to clean up the structure and the ground structure and to complete the road, say, railings, pavements, drainage and mock conclusions. The building is buil...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020