Revision history of "II/373, III/37367 Brezina delay" (Q74850)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,129 bytes −3 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,132 bytes −6 Set a claim value: summary (P836): O projeto resolve a reconstrução das estradas II/373 e III/37367 no atraso das aldeias de Březina, que estão em estado de emergência. Haverá uma substituição completa da estrutura rodoviária, a construção de baías e calçadas de autocarros e deslocalizações forçadas de redes de engenharia civil (gás, abastecimento de água, cabos elétricos e de comunicação). Além disso, será construído um sistema de esgotos para garantir a drenagem das estradas recons...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5015:50, 25 July 2022DG Regio talk contribs 48,466 bytes +27,861 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,532 bytes +1,458 Created claim: summary (P836): Le projet résout la reconstruction des routes II/373 et III/37367 dans le retard des municipalités de Březina, qui sont en état d’urgence. Il y aura un remplacement complet de la structure routière, la construction de baies d’autobus et de leurs chaussées de raccordement et des relais forcés de services publics (gaz, alimentation en eau, câbles électriques et de communication). De plus, un réseau d’égouts pluviaux sera construit pour assurer le...
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 13,074 bytes +91 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,432 bytes +90 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,342 bytes −76 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,418 bytes +1,371 Created claim: summary (P836): The project solves the reconstruction of roads II/373 and III/37367 in the delay of the villages of Březina, which are in emergency condition. There will be a complete replacement of the road structure, the construction of bus bays and sidewalks and forced relocations of civil engineering networks (gas, water supply, electrical and communication cables). In addition, a rain sewer system will be built to ensure drainage of reconstructed roads, li...
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 12,047 bytes −963 Removed claim: summary (P836): The project deals with the reconstruction of the roads II/373 and III/37367 in the thrust of the municipalities of Březina, which are in the emergency situation. There will be a complete exchange of road construction, the construction of bus outlets and their connecting pavements and the forced translation of civil networks (gas, aqueduct, electric power and communication cables). In addition, rainwater drainage shall be built to ensure draina...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,229 bytes +963 Created claim: summary (P836): The project deals with the reconstruction of the roads II/373 and III/37367 in the thrust of the municipalities of Březina, which are in the emergency situation. There will be a complete exchange of road construction, the construction of bus outlets and their connecting pavements and the forced translation of civil networks (gas, aqueduct, electric power and communication cables). In addition, rainwater drainage shall be built to ensure drainage...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020