Revision history of "II/422 Extraordinary-Lednice" (Q74849)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0915:09, 13 October 2024DG Regio talk contribs 51,261 bytes −3 Set a claim value: summary (P836): O projecto diz respeito à reconstrução da estrada II/422 no troço entre a cidade de Podivín e o município de Lednice. O projeto de reconstrução melhora os parâmetros técnico-construtivos das estruturas de comunicação e ponte que estão localizadas na secção dada. A reconstrução da comunicação aumentará a segurança, a suavidade do transporte e o prolongamento da vida útil dos edifícios de pontes. A reconstrução é projetada no percurso existente da seç...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5015:50, 25 July 2022DG Regio talk contribs 48,593 bytes +27,896 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,598 bytes +1,487 Created claim: summary (P836): Le projet porte sur la reconstruction de la route II/422 dans le tronçon entre la ville de Podivín et la municipalité de Lednice. Le projet de reconstruction améliore la construction et les paramètres techniques des structures de communication et de pont situées sur la section donnée. La reconstruction de la communication permettra d’accroître la sécurité, de faciliter le transport et de prolonger la durée de vie des bâtiments du pont. La recons...
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 13,111 bytes +82 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,478 bytes +87 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,391 bytes −77 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,468 bytes +1,457 Created claim: summary (P836): The project deals with the reconstruction of road II/422 in the section between the town of Podivín and the municipality of Lednice. The reconstruction project improves the construction-technical parameters of the communication and bridge structures that are located on the given section. Reconstruction of the communication will increase safety, smoothness of transport and extension of the service life of bridge buildings. The reconstruction is d...
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 12,011 bytes −973 Removed claim: summary (P836): The project deals with the reconstruction of the II/422 road between Podhivín and the district of Lednice. The reconstruction project improves the building and technical parameters of the communication and of the bridges present on the section. The reconstruction of the communication will improve the safety, the flow of traffic and the extension of the useful life of the bridges. The renovation is designed for the current route of the section...

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,180 bytes +973 Created claim: summary (P836): The project deals with the reconstruction of the II/422 road between Podhivín and the district of Lednice. The reconstruction project improves the building and technical parameters of the communication and of the bridges present on the section. The reconstruction of the communication will improve the safety, the flow of traffic and the extension of the useful life of the bridges. The renovation is designed for the current route of the section of...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020