Revision history of "II/303 Jetřichov – Broumov" (Q74848)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 48,685 bytes 0 Changed label, description and/or aliases in pt
  • curprev 21:2621:26, 12 October 2024DG Regio talk contribs 48,685 bytes −10 Set a claim value: summary (P836): Como parte do projeto, a estrada II/303 será reconstruída no troço km 25,18-29,14 km, localmente entre a intersecção das estradas para Jetřichov e a junta de trabalho da estrada atrás do posto de gasolina em Broumov. O comprimento total da secção reconstruída é de 3,96 Km. A secção reconstruída está localizada na rede prioritária IROP selecionada. A execução do projeto aumentará a mobilidade regional e o desenvolvimento da rede de infraestruturas ro...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:5015:50, 25 July 2022DG Regio talk contribs 46,023 bytes +25,982 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 14,267 bytes +1,382 Created claim: summary (P836): Dans le cadre du projet, la route II/303 sera reconstruite dans le tronçon km 25,18-29,14 km, espace entre l’intersection des routes jusqu’à Jetřichov et le joint de travail de la route derrière la station de remplissage de Broumov. La longueur totale de la section reconstruite est de 3,96 km. La section reconstruite est située sur le réseau prioritaire IROP sélectionné. La mise en œuvre du projet permettra d’accroître la mobilité régionale et...
  • curprev 01:3101:31, 29 November 2021DG Regio talk contribs 12,885 bytes +87 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,251 bytes +88 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,163 bytes −87 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 13,250 bytes +1,311 Created claim: summary (P836): As part of the project, road II/303 will be reconstructed in the section km 25.18-29.14 km, locally between the intersection of roads to Jetřichov and the working joint of the road behind the petrol station in Broumov. The total length of the reconstructed section is 3.96 Km. The reconstructed section is located on the selected IROP priority network. The implementation of the project will increase regional mobility and the development of the TE...
  • curprev 22:2422:24, 23 October 2020DG Regio talk contribs 11,939 bytes −886 Removed claim: summary (P836): In the context of the project, communication II/303 will be planned in the stretch of km 25,18-29.14 km, as an interface between road road to Yemenite and working steam at the road refuelling station in Broums. The total length of the renovated section is 3,96 Km. The renovated section is located on a selected priority network of IROPs. The implementation of the project will lead to an increase in regional mobility and the development of a ne...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:3306:33, 27 February 2020DG Regio talk contribs 11,038 bytes +886 Created claim: summary (P836): In the context of the project, communication II/303 will be planned in the stretch of km 25,18-29.14 km, as an interface between road road to Yemenite and working steam at the road refuelling station in Broums. The total length of the renovated section is 3,96 Km. The renovated section is located on a selected priority network of IROPs. The implementation of the project will lead to an increase in regional mobility and the development of a netw...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020