Revision history of "Reconstruction of sidewalks and establishment of cycling lanes on the streets Českoskalická, Pražská v Náchod – II. stage" (Q74806)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,861 bytes −15 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,876 bytes +4 Set a claim value: summary (P836): O objetivo do projeto é construir um corredor de transporte seguro para ciclistas para o transporte diário não motorizado para o emprego, escolas, serviços e atividades de interesse. O projeto surge na sequência da primeira fase já implementada. A realização resultará numa ligação segura e capacitiva dos arredores da cidade com o seu centro ao longo da principal artéria de tráfego. Ao mesmo tempo, será assegurada a circulação segura dos peões ao lon...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:4715:47, 25 July 2022DG Regio talk contribs 48,680 bytes +28,109 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 14,500 bytes +1,367 Created claim: summary (P836): L’objectif du projet est de construire un corridor de transport sûr pour les cyclistes pour le transport quotidien non motorisé vers le travail, les écoles, les services et les activités de loisirs. Le projet suit la première étape déjà réalisée. La réalisation aboutira à une interconnexion sécurisée et capacitive des parties périphériques de la ville avec son centre le long de l’artère principale des transports. Dans le même temps, la circulati...
  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 13,133 bytes +192 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2322:23, 23 October 2020DG Regio talk contribs 13,390 bytes +188 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2322:23, 23 October 2020DG Regio talk contribs 13,202 bytes −211 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2322:23, 23 October 2020DG Regio talk contribs 13,413 bytes +1,292 Created claim: summary (P836): The aim of the project is to build a safe transport corridor for cyclists for everyday non-motorised transport to employment, schools, services and interest activities. The project follows on from the already implemented first stage. The realisation will result in a safe and capacitive connection of the outskirts of the city with its centre along the main traffic artery. At the same time, safe movement of pedestrians along the frequented communi...
  • curprev 22:2322:23, 23 October 2020DG Regio talk contribs 12,121 bytes −806 Removed claim: summary (P836): The aim of the project is to build a safe cycling transport corridor for daily routine non-motorised transport into employment, schools, services and leisure activities. The project follows on from the first stage already implemented. Implementation will result in a safe and capacity link between the city and its centre along the main transport artery. At the same time, safe pedestrian movement along the busy road will be ensured., remove_old_...

31 August 2020

28 August 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:0906:09, 27 February 2020DG Regio talk contribs 11,123 bytes +806 Created claim: summary (P836): The aim of the project is to build a safe cycling transport corridor for daily routine non-motorised transport into employment, schools, services and leisure activities. The project follows on from the first stage already implemented. Implementation will result in a safe and capacity link between the city and its centre along the main transport artery. At the same time, safe pedestrian movement along the busy road will be ensured., Adding Englis...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020