Revision history of "Otrokovice – backbone cycle path Otrokovice – Vizovice – connection of the settlement Střed" (Q74802)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,713 bytes −11 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,724 bytes −18 Set a claim value: summary (P836): O projeto trata da construção e da rota segura da ciclovia da cidade como uma via para ciclistas e peões, em parte com uma operação comum e em parte separada, que é realizada nas rotas das estradas pedonais existentes. A ciclovia cumprirá a função de recolha e assegurará a interligação do centro habitacional com a sua parte central do ponto de vista do transporte ciclável, representando simultaneamente a ligação da parte central da cidade à rota cic...

22 March 2024

15 January 2024

19 June 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:4715:47, 25 July 2022DG Regio talk contribs 48,558 bytes +28,344 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 14,060 bytes +1,402 Created claim: summary (P836): Le projet résout la construction et la traçabilité sûre de la piste cyclable de la ville en tant que piste pour les cyclistes et les piétons, en partie avec la circulation commune et en partie séparée, qui est effectuée sur les routes piétonnes existantes. La piste cyclable remplira une fonction de collecte et en termes de transport cyclable assurer la connexion du développement résidentiel du lotissement Střed avec sa partie centrale, en même...
  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 12,658 bytes +160 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2322:23, 23 October 2020DG Regio talk contribs 12,947 bytes +157 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2322:23, 23 October 2020DG Regio talk contribs 12,790 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2322:23, 23 October 2020DG Regio talk contribs 12,930 bytes +1,368 Created claim: summary (P836): The project deals with the construction and safe route of the city cycle path as a path for cyclists and pedestrians partly with a common and partly separate operation, which is conducted on the routes of existing pedestrian roads. The cycle path will fulfil the collection function and ensure the interconnection of residential housing center with its central part from the point of view of cycling transport, simultaneously it represents the conn...
  • curprev 22:2322:23, 23 October 2020DG Regio talk contribs 11,562 bytes −870 Removed claim: summary (P836): The project deals with the construction and safe ways of managing the urban cycle path as a path for cyclists and pedestrians partly with joint and partly separated traffic on existing pedestrian routes. The cycle path will fulfil the collection function and ensure, from the point of view of the adjustment, the integration of the residential installation of the Centre with its central part, linking the central part of the city to the backbone...

24 September 2020

22 September 2020

31 August 2020

28 August 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:0806:08, 27 February 2020DG Regio talk contribs 10,660 bytes +870 Created claim: summary (P836): The project deals with the construction and safe ways of managing the urban cycle path as a path for cyclists and pedestrians partly with joint and partly separated traffic on existing pedestrian routes. The cycle path will fulfil the collection function and ensure, from the point of view of the adjustment, the integration of the residential installation of the Centre with its central part, linking the central part of the city to the backbone o...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

11 January 2020