Revision history of "Cycle path Rožnov – Bee, k. ú. No. Budějovice 7-2. + 3rd stage" (Q74781)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 52,402 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 52,403 bytes −15 Set a claim value: summary (P836): O projeto diz respeito à construção de uma ciclovia separada em conjunto com a estrada III/00354 (Lidická třída) em České Budějovice. No âmbito desta construção, prevê-se a construção de duas secções de ciclovias. Uma ciclovia construída na 2.a fase deve ter um comprimento de 89,33 m; a ciclovia construída na 3.a fase é concebida num comprimento de 175,58 m. A futura pista conduzirá o tráfego ciclável atual a partir da estrada com uma intensidade de...

7 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:4515:45, 25 July 2022DG Regio talk contribs 49,226 bytes +28,583 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 14,576 bytes +1,462 Created claim: summary (P836): Le projet résout la construction d’une piste cyclable distincte en parallèle avec la route III/00354 (Lidická třída) à České Budějovice. La construction de deux sections de pistes cyclables est prévue dans le cadre de cette construction. La piste cyclable construite dans le cadre de l’étape 2 est conçue pour une longueur de 89,33 m; la piste cyclable construite à l’intérieur de la 3ème étape est conçue pour une longueur de 175,58 m. La future pi...
  • curprev 01:3001:30, 29 November 2021DG Regio talk contribs 13,114 bytes +139 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,424 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,297 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,423 bytes +1,366 Created claim: summary (P836): The project deals with the construction of a separate cycle path in conjunction with road III/00354 (Lidická třída) in České Budějovice. Within this construction, the construction of two sections of cycle paths is envisaged. A cycle path built within the 2nd stage is designed with a length of 89,33 m; the cycle path built within the 3rd stage is designed in a length of 175.58 m. The future trail will lead the current cycling traffic from the roa...
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 12,057 bytes −845 Removed claim: summary (P836): The project deals with the construction of separate cycle paths in accordance with the road III/00354 (Human Class) in České Budějovice. The construction of two cycle paths is envisaged. Cycle paths developed under Stage 2 is designed for a length of 89.33 m; a 3nd stage cycle path is designed for 175.58 m. the future path is planned to bring about the current cycle traffic from roads with traffic of around 10 000 vehicles/day, thereby improvi...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:0806:08, 27 February 2020DG Regio talk contribs 11,634 bytes +845 Created claim: summary (P836): The project deals with the construction of separate cycle paths in accordance with the road III/00354 (Human Class) in České Budějovice. The construction of two cycle paths is envisaged. Cycle paths developed under Stage 2 is designed for a length of 89.33 m; a 3nd stage cycle path is designed for 175.58 m. the future path is planned to bring about the current cycle traffic from roads with traffic of around 10 000 vehicles/day, thereby improving...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

17 January 2020

16 January 2020

11 January 2020