Revision history of "TRAIL FOR PEDESTRIANS AND CYCLISTS ALONG THE CLASS OF T. BATI, UL. LORENCOVA – UL. I‘M SURE YOU’LL BE FINE." (Q74754)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 53,347 bytes +3 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 53,344 bytes −29 Set a claim value: summary (P836): O objetivo do projeto é construir uma estrada para pedestres e ciclistas, que é logicamente conduzida em conjunto com o eixo básico de transporte de toda a Zlín, a classe T. Bati, que também atua como um atraso da estrada I/49 pela cidade. A ciclovia cumprirá a função de recolha e assegurará a ligação das habitações na parte oriental da cidade com a sua parte central do ponto de vista do transporte ciclável, ao mesmo tempo que representa uma variant...

20 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:4315:43, 25 July 2022DG Regio talk contribs 50,181 bytes +29,259 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 15,547 bytes +1,438 Created claim: summary (P836): L’objectif du projet est la construction d’une route pour les piétons et les cyclistes, qui est logiquement menée parallèlement à l’axe de transport de base de toute la classe Zlín, T. Bati, qui sert également de retard de la route I/49 par la ville. L’itinéraire cyclable effectuera une fonction de collecte et assurera la connexion des bâtiments résidentiels dans la partie orientale de la ville avec sa partie centrale en termes de transport cycl...
  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 14,109 bytes +162 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 14,400 bytes +173 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 14,227 bytes −138 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 14,365 bytes +1,401 Created claim: summary (P836): The aim of the project is to build a road for pedestrians and cyclists, which is logically conducted in conjunction with the basic transport axis of the whole Zlín, the T. Bati class, which also acts as a delay of road I/49 by the city. The cycle route will fulfil the collection function and ensure the connection of residential housing in the eastern part of the city with its central part from the point of view of cycling transport, at the same...
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 12,964 bytes −931 Removed claim: summary (P836): The aim of the project is to build communication for pedestrians and cyclists, which is being developed in conjunction with the basic transport axis of the whole of Zlín, the class of T. Bati, which also serves as the road for road I/49 by the city. The cycle route will fulfil the mopping up function and ensure, from the point of view of the cycle, the integration of residential installation in the eastern part of the town with its central par...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:0806:08, 27 February 2020DG Regio talk contribs 12,210 bytes +931 Created claim: summary (P836): The aim of the project is to build communication for pedestrians and cyclists, which is being developed in conjunction with the basic transport axis of the whole of Zlín, the class of T. Bati, which also serves as the road for road I/49 by the city. The cycle route will fulfil the mopping up function and ensure, from the point of view of the cycle, the integration of residential installation in the eastern part of the town with its central part,...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020