Revision history of "Acquisition of 11 low-floor trolleybuses" (Q74753)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,082 bytes −1 Changed label, description and/or aliases in pt
  • curprev 05:4405:44, 13 October 2024DG Regio talk contribs 51,083 bytes −4 Set a claim value: summary (P836): O projeto inclui a aquisição de 11 novos tróleis articulados de piso rebaixado (incluindo diagnósticos necessários, ferramentas especiais e formação necessária para a manutenção e reparação de veículos). O principal motivo e objetivo do projeto é contribuir para a manutenção, modernização e extensão da vida útil de todo o sistema através da aquisição de novos veículos pelo transporte público livre de emissões na metrópole de České Budějovice. Graças...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:4315:43, 25 July 2022DG Regio talk contribs 49,391 bytes +28,568 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 14,579 bytes +1,471 Created claim: summary (P836): Le projet comprend l’acquisition de 11 nouveaux trolleybus articulés à plancher bas (y compris les diagnostics nécessaires, les outils spéciaux et la formation nécessaire à l’entretien et à la réparation des véhicules). L’objectif principal du projet est de contribuer par l’acquisition de nouveaux véhicules à l’entretien, à la modernisation et à l’allongement de la durée de vie de l’ensemble du système de transport public sans émission dans la m...
  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 13,108 bytes +103 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,454 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,355 bytes −99 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 13,454 bytes +1,413 Created claim: summary (P836): The project includes the acquisition of 11 new articulated low-floor trolleybuses (including necessary diagnostics, special tools and training necessary for maintenance and repair of vehicles). The main motive and goal of the project is to contribute to the maintenance, modernisation and extension of the life of the whole system through the acquisition of new vehicles by the emission-free public transport in the České Budějovice metropolis. Than...
  • curprev 22:2222:22, 23 October 2020DG Regio talk contribs 12,041 bytes −900 Removed claim: summary (P836): The content of the project is the acquisition of 11 pieces of new articulated low deck trolley-bus (including the necessary diagnostics, special tools and training necessary for the maintenance and repair of the vehicles). The main motive and, at the same time, the project’s objective is to contribute to the maintenance, modernisation and extension of the lifetime of the entire emission-free MHD system in the waiting area. The project will lea...

17 July 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:0806:08, 27 February 2020DG Regio talk contribs 11,650 bytes +900 Created claim: summary (P836): The content of the project is the acquisition of 11 pieces of new articulated low deck trolley-bus (including the necessary diagnostics, special tools and training necessary for the maintenance and repair of the vehicles). The main motive and, at the same time, the project’s objective is to contribute to the maintenance, modernisation and extension of the lifetime of the entire emission-free MHD system in the waiting area. The project will lead...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020