Revision history of "CENTRAL TRANSPORT TERMINAL ČESKÝ TĚŠÍN AND CAR PARK P+R" (Q74701)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 50,609 bytes −14 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 50,623 bytes −11 Set a claim value: summary (P836): A realização do projeto consiste na construção de um novo terminal de transportes (movimento da estação rodoviária existente) e infraestruturas conexas, ou seja, construção de lugares de estacionamento, áreas de estacionamento, vias pedonais, edifícios de registo, deslocalizações e nova gestão de infraestruturas técnicas. A execução do projeto contribuirá para a interligação moderna e atrativa de vários modos de transporte de uma importante junção d...

22 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:3915:39, 25 July 2022DG Regio talk contribs 46,418 bytes +27,248 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:2801:28, 29 November 2021DG Regio talk contribs 13,344 bytes +1,399 Created claim: summary (P836): La mise en œuvre du projet porte sur la construction d’un nouveau terminal de transport (mouvement de la gare routière existante) et des infrastructures connexes, c’est-à-dire la construction d’aires de stationnement, d’aires de stationnement, d’itinéraires pour piétons, de bâtiments d’aire de trafic, de relocalisations et de nouvelles infrastructures techniques. La mise en œuvre du projet contribuera à l’interconnexion moderne et attrayante de...
  • curprev 01:2801:28, 29 November 2021DG Regio talk contribs 11,945 bytes +120 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:5421:54, 23 October 2020DG Regio talk contribs 12,274 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5421:54, 23 October 2020DG Regio talk contribs 12,155 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5421:54, 23 October 2020DG Regio talk contribs 12,288 bytes +1,314 Created claim: summary (P836): The realisation of the project is the construction of a new transport terminal (movement of the existing bus station) and related infrastructure, i.e. construction of parking spaces, parking areas, pedestrian routes, check-in buildings, relocations and new technical infrastructure management. The implementation of the project will contribute to the modern and attractive interconnection of several modes of transport of a significant transfer junc...
  • curprev 21:5421:54, 23 October 2020DG Regio talk contribs 10,974 bytes −870 Removed claim: summary (P836): The implementation of the project is to address the construction of the new transport terminal (redeployment of the existing bus station) and the related infrastructure, i.e. the construction of parking areas, parking areas, pedestrian areas, ramp buildings, translation and new management of the technical infrastructure. The implementation of the project will contribute to a modern and attractive connection of several transport modes with a si...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1606:16, 27 February 2020DG Regio talk contribs 10,575 bytes +870 Created claim: summary (P836): The implementation of the project is to address the construction of the new transport terminal (redeployment of the existing bus station) and the related infrastructure, i.e. the construction of parking areas, parking areas, pedestrian areas, ramp buildings, translation and new management of the technical infrastructure. The implementation of the project will contribute to a modern and attractive connection of several transport modes with a sign...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020