Revision history of "Cycle path Bečva – right-shore route, st stage" (Q74698)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 49,244 bytes −2 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 49,246 bytes −9 Set a claim value: summary (P836): A construção da ciclovia resolve a primeira fase de interligação segura do troço já construído de Lipník nad Bečvou até ao início da fronteira da aldeia de Černotín, onde a ciclovia seguirá noutra próxima ciclovia e ligação de outras aldeias de Skalička e Ústí. É uma seção importante para o transporte de bicicleta mais seguro das aldeias vizinhas para a cidade de Hranice, usado principalmente para deslocamentos para escolas e empregos.

7 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:3915:39, 25 July 2022DG Regio talk contribs 46,581 bytes +26,535 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:2801:28, 29 November 2021DG Regio talk contribs 15,143 bytes +1,359 Created claim: summary (P836): La construction de la piste cyclable résout la première phase de la connexion sûre de la section déjà construite de Lipník nad Bečvou au début de la limite du cadastre du village de Černotín, où la piste cyclable suivra la section suivante de la route cyclable et la connexion d’autres municipalités de Skalička et Ústí. Il s’agit d’une section importante pour des transports à vélo plus sûrs entre les villages voisins et la ville de Hranice, princ...
  • curprev 01:2801:28, 29 November 2021DG Regio talk contribs 13,784 bytes +121 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:5421:54, 23 October 2020DG Regio talk contribs 14,116 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5421:54, 23 October 2020DG Regio talk contribs 14,008 bytes −96 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5421:54, 23 October 2020DG Regio talk contribs 14,104 bytes +1,285 Created claim: summary (P836): Construction of the cycle path solves the first stage of safe interconnection of the already built section from Lipník nad Bečvou to the beginning of the border of the village Černotín, where the cycle path will follow on another upcoming cycle route and connection of other villages Skalička and Ústí. It is an important section for safer cycling transport from the surrounding villages to the town of Hranice, mainly used for commuting to schools...
  • curprev 21:5421:54, 23 October 2020DG Regio talk contribs 12,819 bytes −868 Removed claim: summary (P836): The construction of the cycle path is being addressed by the first stage of the safe connection of the built stretch from the Leipzig nad Bečvou district to the Černotín registry, where the cycle path will be followed by the next stage of the cyclopath and the connection of the other municipalities with the Scalička and Ústí. This is an important stretch for safer cycling from the surrounding municipalities to the city of Hranice, used, in par...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1606:16, 27 February 2020DG Regio talk contribs 12,014 bytes +868 Created claim: summary (P836): The construction of the cycle path is being addressed by the first stage of the safe connection of the built stretch from the Leipzig nad Bečvou district to the Černotín registry, where the cycle path will be followed by the next stage of the cyclopath and the connection of the other municipalities with the Scalička and Ústí. This is an important stretch for safer cycling from the surrounding municipalities to the city of Hranice, used, in parti...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020