Revision history of "Acquisition of electric buses for the town of Bílina" (Q74669)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 52,547 bytes −65 Set a claim value: summary (P836): O projeto inclui a aquisição de 3 unidades de autocarros a bateria de piso rebaixado em substituição dos automóveis a gasóleo existentes não conformes.O objetivo é reduzir as emissões produzidas pelos veículos de transporte público em Bílina e melhorar a capacidade de serviço básico de transporte no âmbito da obrigação de serviço público.O projeto é uma fase única e inclui uma atividade principal e duas atividades secundárias.O projeto é simples (co...

12 March 2024

15 January 2024

19 June 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:3715:37, 25 July 2022DG Regio talk contribs 49,940 bytes +29,235 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 14,570 bytes +1,498 Created claim: summary (P836): Le contenu du projet est l’acquisition de 3 pièces d’autobus à batterie à plancher bas en échange de voitures diesel existantes non conformes. L’objectif est de réduire les émissions produites par les véhicules de transport public à Bílina et d’améliorer le service de transport de base dans le cadre de l’obligation de service public.Le projet est à guichet unique et comprend une activité principale et 2 secondaires. Le projet est par nature simp...
  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 13,072 bytes +109 Changed label, description and/or aliases in fr: translated_label

29 October 2020

23 October 2020

  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 13,408 bytes +112 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 13,296 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 13,391 bytes +1,397 Created claim: summary (P836): The project includes the acquisition of 3 units of low-floor battery buses as a replacement for existing non-compliant diesel cars.The aim is to reduce emissions produced by public transport vehicles in Bílina and improve the basic transport serviceability under the public service obligation.The project is single stage and includes 1 main activity and 2 secondary activities.The project is simple (buying vehicles). Thanks to this, the project is...
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 11,994 bytes −906 Removed claim: summary (P836): The project consists of purchasing 3 low-deck battery buses as a substitute for the existing non-compliant diesel cars. the aim is to reduce the emissions produced by MHD in Bíliny and to improve basic transport services under a public service obligation. the project is single-mode and involves 1 main activity and 2 is subcontracting. the project is simple in nature (purchase of vehicles). As a result, the project is not risky, with vehicles p...

17 July 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1606:16, 27 February 2020DG Regio talk contribs 11,617 bytes +906 Created claim: summary (P836): The project consists of purchasing 3 low-deck battery buses as a substitute for the existing non-compliant diesel cars. the aim is to reduce the emissions produced by MHD in Bíliny and to improve basic transport services under a public service obligation. the project is single-mode and involves 1 main activity and 2 is subcontracting. the project is simple in nature (purchase of vehicles). As a result, the project is not risky, with vehicles pro...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020