Revision history of "Bike path Koterov – Old Plzenec" (Q74660)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 50,653 bytes +13 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 50,640 bytes +5 Set a claim value: summary (P836): Construção de uma ciclovia entre a parte urbana de Pilsen – Koterov com um comprimento total de 3,14 km. O principal objetivo do projeto é complementar o sistema Greenways construído pela secção e melhorar as condições para chegar à população para oportunidades de trabalho, escolas e serviços. Outro objetivo é melhorar a ligação dos municípios a sudeste de Pilsen ao território do distrito municipal de Pilsen 2 – Slovany e ao centro da cidade de Pils...

12 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:3615:36, 25 July 2022DG Regio talk contribs 47,962 bytes +27,305 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

2 December 2021

29 November 2021

  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 14,463 bytes +1,453 Created claim: summary (P836): Construction d’une piste cyclable entre Plzeň — Koterov d’une longueur totale de 3,14 km. L’objectif principal du projet est de compléter le système des voies vertes construit par la section et d’améliorer ainsi les conditions d’arrivée des résidents dans les possibilités de travail, les écoles et les services. Un autre objectif dans le cas du tronçon en question est d’améliorer la connexion des communes au sud-est de Pilsen vers le territoire d...
  • curprev 01:2901:29, 29 November 2021DG Regio talk contribs 13,010 bytes +100 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 13,359 bytes +92 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 13,267 bytes −85 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 13,352 bytes +1,377 Created claim: summary (P836): Construction of a cycle path between the city part Pilsen – Koterov with a total length of 3.14 km. The main objective of the project is to supplement the Greenways system built by the section and improve the conditions for reaching the population for work opportunities, schools and services. Another objective is to improve the connection of municipalities to the southeast of Pilsen towards the territory of the city district Pilsen 2 – Slovany a...
  • curprev 21:5321:53, 23 October 2020DG Regio talk contribs 11,975 bytes −978 Removed claim: summary (P836): Construction of a cycle path between the municipal district of Plzeň — Koterov, totalling 3.14 km. The main objective of the project is to complement the system with a system of greenways and thus to improve the conditions for the population to be employed, in schools and in services. In particular, the aim is, in the case of the section in question, to improve the connection of the municipalities to the south-east of Plzeň from the City of Pl...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1606:16, 27 February 2020DG Regio talk contribs 11,685 bytes +978 Created claim: summary (P836): Construction of a cycle path between the municipal district of Plzeň — Koterov, totalling 3.14 km. The main objective of the project is to complement the system with a system of greenways and thus to improve the conditions for the population to be employed, in schools and in services. In particular, the aim is, in the case of the section in question, to improve the connection of the municipalities to the south-east of Plzeň from the City of Plze...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020