Revision history of "Comprehensive support for transport safety along road II/451 in the municipality of Karlovice" (Q74499)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2321:23, 12 October 2024DG Regio talk contribs 51,994 bytes 0 Set a claim value: summary (P836): O objetivo do projeto é completar percursos pedonais através da construção de passadiços sem barreiras ao longo da estrada II/451 e ainda:- assegurando 4 paragens de autocarro sem barreiras no sistema de transportes integrado, uma destas paragens está incluída entre as despesas inelegíveis,- melhorando o estado de duas passagens pedonais existentes, aumentando a sua segurança e garantindo a sua liberdade de barreiras – através da construção de 3 nov...

23 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:2515:25, 25 July 2022DG Regio talk contribs 49,320 bytes +28,679 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2301:23, 29 November 2021DG Regio talk contribs 14,516 bytes +1,385 Created claim: summary (P836): Le projet a pour objet l’achèvement des routes piétonnes grâce à la construction de trottoirs sans barrières le long de la route II/451 et en outre:- l’absence d’obstacles pour 4 arrêts d’autobus dans le système de transport intégré, l’un de ces arrêts est inclus parmi les dépenses inéligibles,- l’amélioration de l’état des deux passages pour piétons existants en améliorant leur sécurité et leur accessibilité,- en construisant 3 nouveaux passage...
  • curprev 01:2301:23, 29 November 2021DG Regio talk contribs 13,131 bytes +145 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3521:35, 23 October 2020DG Regio talk contribs 13,435 bytes +152 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3521:35, 23 October 2020DG Regio talk contribs 13,283 bytes −156 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3521:35, 23 October 2020DG Regio talk contribs 13,439 bytes +1,331 Created claim: summary (P836): The object of the project is to complete pedestrian routes through the construction of barrier-free walkways along the II/451 road and further:- ensuring barrier-free 4 bus stops in the integrated transport system, one of these stops is included among ineligible expenses,- improving the status of two existing pedestrian crossings by increasing their safety and ensuring their barrier-freeness – by building 3 new barrier-free crossings for pedestr...
  • curprev 21:3421:34, 23 October 2020DG Regio talk contribs 12,108 bytes −880 Removed claim: summary (P836): The purpose of the project is the completion of pedestrian paths by building barrier-free pavements along the II/451 road and further: — ensuring the barrier-free accessibility of 4 bus stops in the integrated transport system, one of these stops being among ineligible expenditure, — improvement of the status of two existing pedestrian crossings by increasing their safety and ensuring their accessibility, — by creating 3 new pedestrian crossin...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1106:11, 27 February 2020DG Regio talk contribs 11,721 bytes +880 Created claim: summary (P836): The purpose of the project is the completion of pedestrian paths by building barrier-free pavements along the II/451 road and further: — ensuring the barrier-free accessibility of 4 bus stops in the integrated transport system, one of these stops being among ineligible expenditure, — improvement of the status of two existing pedestrian crossings by increasing their safety and ensuring their accessibility, — by creating 3 new pedestrian crossing...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020