Revision history of "Sidewalk along road II/474 in Třanovice" (Q74478)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 05:4105:41, 13 October 2024DG Regio talk contribs 49,613 bytes −5 Set a claim value: summary (P836): O projeto será executado através da construção de uma estrutura de pavimento, incluindo a sua iluminação, passarela para peões e transferência da coluna da linha elétrica existente, incluindo a deslocação da iluminação existente. O principal objetivo do projeto é garantir a circulação segura e sem barreiras de pessoas com mobilidade reduzida ao longo da segunda estrada mais importante (II/474) no município e o atual aumento da segurança do tráfego n...

12 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:2415:24, 25 July 2022DG Regio talk contribs 46,426 bytes +26,346 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2301:23, 29 November 2021DG Regio talk contribs 14,218 bytes +1,362 Created claim: summary (P836): La mise en œuvre du projet se traduira par la construction d’un corps de trottoir comprenant son éclairage, sa passerelle pour piétons et le déplacement du poteau de ligne électrique existant, y compris le déplacement de l’éclairage existant. L’objectif principal du projet est donc d’assurer la sécurité et la liberté de circulation des personnes à mobilité réduite le long de la deuxième route la plus importante (II/474) de la municipalité, tout...
  • curprev 01:2301:23, 29 November 2021DG Regio talk contribs 12,856 bytes +108 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3421:34, 23 October 2020DG Regio talk contribs 13,197 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3421:34, 23 October 2020DG Regio talk contribs 13,098 bytes −98 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3421:34, 23 October 2020DG Regio talk contribs 13,196 bytes +1,265 Created claim: summary (P836): The project will be implemented by building a pavement body including its lighting, footbridge for pedestrians and transfer of the existing power line column, including displacement of existing lighting. The main objective of the project is to ensure safe and barrier-free movement of persons with reduced mobility along the second most important road (II/474) in the municipality and the current increase in traffic safety in the given section., tr...
  • curprev 21:3421:34, 23 October 2020DG Regio talk contribs 11,931 bytes −822 Removed claim: summary (P836): The implementation of the project will lead to the building of a corridor body including its lighting, footrests and the relocation of the current electricity column, including a shift of existing lighting. The main objective of the project is thus to ensure the safe and barrier-free movement of persons with reduced mobility along the second most important road (II/474) in the municipality and the current increase of traffic safety in the sect...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1106:11, 27 February 2020DG Regio talk contribs 11,486 bytes +822 Created claim: summary (P836): The implementation of the project will lead to the building of a corridor body including its lighting, footrests and the relocation of the current electricity column, including a shift of existing lighting. The main objective of the project is thus to ensure the safe and barrier-free movement of persons with reduced mobility along the second most important road (II/474) in the municipality and the current increase of traffic safety in the sector...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020