Revision history of "Reconstruction of the sidewalk in Tyršova Street" (Q74455)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 50,447 bytes −2 Set a claim value: summary (P836): O objetivo do projeto é a reconstrução do pavimento e da iluminação pública na rua Tyršova, em Čáslav. A execução do projecto será reconstruída 1248,3 m de estrada pedonal e iluminação pública em todo o seu comprimento. O objetivo do projeto é garantir a segurança e a liberdade de barreiras das estradas pedonais, que cumprirão as condições do Decreto n.o 398/2009 Coll.. O projeto inclui 8 locais para travessias, incluindo a sua iluminação. Há três p...

20 March 2024

15 January 2024

22 December 2023

19 June 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:2215:22, 25 July 2022DG Regio talk contribs 47,257 bytes +27,023 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 14,336 bytes +1,349 Created claim: summary (P836): L’objet du projet est la reconstruction du trottoir et de l’éclairage public dans la rue Tyršova à Čáslav. Le projet reconstruira 1 248,3 m de route piétonne et d’éclairage public sur toute sa longueur. L’objectif du projet est d’assurer la sécurité et l’absence d’obstacles de la route piétonne, qui répondra aux conditions du décret no 398/2009 Coll.. Le projet comprend 8 endroits à traverser, y compris l’éclairage. Il y a trois arrêts de bus et...
  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 12,987 bytes +106 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,330 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,222 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,330 bytes +1,344 Created claim: summary (P836): The object of the project is the reconstruction of the pavement and public lighting in Tyršova street in Čáslav. Implementation of the project will be reconstructed 1248.3 m pedestrian road and public lighting in its entire length. The aim of the project is to ensure the safety and barrier-freeness of pedestrian roads, which will meet the conditions of Decree No. 398/2009 Coll.. The project includes 8 places for crossings, including their illumi...
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 11,986 bytes −939 Removed claim: summary (P836): The subject of the project is the reconstruction of the pavement and public street lighting at Tyrshova’s street in part. The implementation of the project will lead to the reconstruction of 1 248.3 m of walking communication and public lighting throughout the whole length of the project. The aim of the project is to ensure the safety and accessibility of the footpath which will satisfy the conditions laid down in Decree No 398/2009. The proje...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1006:10, 27 February 2020DG Regio talk contribs 11,651 bytes +939 Created claim: summary (P836): The subject of the project is the reconstruction of the pavement and public street lighting at Tyrshova’s street in part. The implementation of the project will lead to the reconstruction of 1 248.3 m of walking communication and public lighting throughout the whole length of the project. The aim of the project is to ensure the safety and accessibility of the footpath which will satisfy the conditions laid down in Decree No 398/2009. The project...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020