Revision history of "Path for cyclists and pedestrians Hrachovec – Chodovice" (Q74442)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2321:23, 12 October 2024DG Regio talk contribs 52,908 bytes 0 Changed label, description and/or aliases in pt
  • curprev 21:2321:23, 12 October 2024DG Regio talk contribs 52,908 bytes +45 Set a claim value: summary (P836): O projecto trata da construção de um novo caminho para ciclistas e peões entre Hrachovce e Chodovice no comprimento de 1,6 km. Graças à construção desta secção, os cidadãos de Holovous e Chodovic poderão deslocar-se em segurança para o trabalho, as escolas para Hořice e vice-versa. O trilho percorrerá, assim, o percurso ciclável a partir da estrada I. classe 35 com a atual intensidade de tráfego de 10-15 mil veículos por dia e, assim, aumentará cons...

22 March 2024

15 January 2024

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:2115:21, 25 July 2022DG Regio talk contribs 50,189 bytes +29,329 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 14,619 bytes +1,497 Created claim: summary (P836): Le projet résout la construction d’un nouveau sentier pour les cyclistes et les piétons entre Hrachovce et Chodovice sur une longueur de 1,6 km. Grâce à la construction de cette section, les citoyens de Holovous et Chodovice seront en mesure de se déplacer en toute sécurité pour le travail, vers les écoles à Hořice et vice versa. Le sentier partira ainsi de la route 35 avec l’intensité de circulation actuelle de 10 à 15 000 véhicules par jour, a...
  • curprev 01:2201:22, 29 November 2021DG Regio talk contribs 13,122 bytes +117 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,454 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,338 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 13,448 bytes +1,424 Created claim: summary (P836): The project deals with the construction of a new path for cyclists and pedestrians between Hrachovce and Chodovice in the length of 1.6 km. Thanks to the construction of this section, citizens of Holovous and Chodovic will be able to commute safely to work, schools to Hořice and vice versa. The trail will thus take the cycling route from the I. class 35 road with the current traffic intensity of 10-15 thousand vehicles per day and thus greatly i...
  • curprev 21:3321:33, 23 October 2020DG Regio talk contribs 12,024 bytes −957 Removed claim: summary (P836): The project deals with the construction of a new path for cyclists and pedestrians between Hradec and Chodovky cycle of 1.6 km. The construction of the section will enable the citizens of Haloous and Chodovic to be safely commuting, to the schools to Hořác and vice versa. Thus, the road runs the cycle from Class I of Class I from Class I 35 with the current traffic intensity of 10-15 vehicles per day and, by doing so, will greatly increase the...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1206:12, 27 February 2020DG Regio talk contribs 11,714 bytes +957 Created claim: summary (P836): The project deals with the construction of a new path for cyclists and pedestrians between Hradec and Chodovky cycle of 1.6 km. The construction of the section will enable the citizens of Haloous and Chodovic to be safely commuting, to the schools to Hořác and vice versa. Thus, the road runs the cycle from Class I of Class I from Class I 35 with the current traffic intensity of 10-15 vehicles per day and, by doing so, will greatly increase the s...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020