Revision history of "Construction of a sidewalk in Lipovská Street, Jeseník" (Q74426)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 21:2321:23, 12 October 2024DG Regio talk contribs 52,833 bytes 0 Changed label, description and/or aliases in pt
  • curprev 21:2321:23, 12 October 2024DG Regio talk contribs 52,833 bytes −13 Set a claim value: summary (P836): O objetivo do projeto é aumentar a segurança do transporte na rua Lipovská, na cidade de Jeseník, o que resultará na conclusão da passarela pedonal e na exclusão deste modo de transporte do corpo da estrada da classe III. As atividades do projeto são a conclusão de um passadiço pedonal em dois ramos, que seguirá a calçada existente e estenderá o pavimento até ao final da aldeia, a construção de um local de passagem para peões, incluindo iluminação d...

23 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:2015:20, 25 July 2022DG Regio talk contribs 49,655 bytes +28,664 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2301:23, 29 November 2021DG Regio talk contribs 14,647 bytes +1,488 Created claim: summary (P836): L’objectif du projet est d’accroître la sécurité des transports sur la rue Lipovská dans la ville de Jeseník, ce qui se fera en complétant un trottoir piétonnier et en excluant ce mode de transport du corps de la route III. classe. Les activités du projet sont l’achèvement d’une passerelle piétonne en deux branches, qui suivra le trottoir existant et prolongera le trottoir jusqu’à l’extrémité du village, ainsi que la construction d’un lieu de pa...
  • curprev 01:2301:23, 29 November 2021DG Regio talk contribs 13,159 bytes +116 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:0522:05, 23 October 2020DG Regio talk contribs 13,492 bytes +115 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:0522:05, 23 October 2020DG Regio talk contribs 13,377 bytes −107 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:0522:05, 23 October 2020DG Regio talk contribs 13,484 bytes +1,451 Created claim: summary (P836): The aim of the project is to increase transport safety on Lipovská Street in the town of Jeseník, which will result in the completion of the pedestrian walkway and the exclusion of this mode of transport from the body of the III.class road. The activities of the project are the completion of a pedestrian walkway in two branches, which will follow the existing sidewalk and extend the pavement to the end of the village, further construction of a p...
  • curprev 22:0522:05, 23 October 2020DG Regio talk contribs 12,033 bytes −966 Removed claim: summary (P836): The aim of the project is to increase traffic safety on the street in Jeseník, in the city of Jeseník, and this will be done through the completion of the pedestrian walkway and the exclusion of this mode of transport from the body of the road III.3dy. The work of the project is the building of a pedestrian corridor in two branches that will build on the existing walkway and extend the walkway to the end of the municipality, the construction o...

24 September 2020

22 September 2020

17 July 2020

7 June 2020

25 March 2020

19 March 2020

27 February 2020

  • curprev 06:1206:12, 27 February 2020DG Regio talk contribs 11,725 bytes +966 Created claim: summary (P836): The aim of the project is to increase traffic safety on the street in Jeseník, in the city of Jeseník, and this will be done through the completion of the pedestrian walkway and the exclusion of this mode of transport from the body of the road III.3dy. The work of the project is the building of a pedestrian corridor in two branches that will build on the existing walkway and extend the walkway to the end of the municipality, the construction of...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020