Revision history of "Reconstruction of the fire brigade JSDH Třemošnice, JPO II" (Q74418)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 51,613 bytes −2 Changed label, description and/or aliases in pt
  • curprev 15:0815:08, 13 October 2024DG Regio talk contribs 51,615 bytes −7 Set a claim value: summary (P836): O objetivo do projeto é concluir a reconstrução e a extensão da utilização do edifício do arsenal JSDH Třemošnice, incluindo modificações de áreas ao ar livre. O novo arsenal será estruturalmente resiliente aos efeitos de impactos extraordinários de alta queda de neve, gelo maciço, orcs, tempestades de vento e secas extremas que assolam o atual objeto insatisfatório do arsenal. Graças à resistência do edifício do arsenal, haverá um aumento significa...

20 March 2024

15 January 2024

22 December 2023

12 June 2023

17 February 2023

25 July 2022

  • curprev 15:1915:19, 25 July 2022DG Regio talk contribs 47,918 bytes +27,850 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

24 February 2022

15 January 2022

14 January 2022

14 December 2021

3 December 2021

29 November 2021

  • curprev 01:2301:23, 29 November 2021DG Regio talk contribs 14,876 bytes +1,412 Created claim: summary (P836): L’objectif du projet est la reconstruction complète et l’extension de l’utilisation du bâtiment de l’armement SSDH Třemošnice, y compris les modifications des espaces extérieurs. La nouvelle armure sera structurellement résistante aux effets extraordinaires des fortes précipitations de neige, du gel massif, des orcanes, des vents et des sécheresses extrêmes, qui frappent l’objet actuel insatisfaisant de l’armurerie. Grâce à la rénovation du bâti...
  • curprev 01:2301:23, 29 November 2021DG Regio talk contribs 13,464 bytes +126 Changed label, description and/or aliases in fr: translated_label

27 December 2020

29 October 2020

23 October 2020

  • curprev 22:0522:05, 23 October 2020DG Regio talk contribs 13,791 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 22:0522:05, 23 October 2020DG Regio talk contribs 13,672 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 22:0522:05, 23 October 2020DG Regio talk contribs 13,805 bytes +1,369 Created claim: summary (P836): The aim of the project is to complete reconstruction and extension of the use of the building of the JSDH Třemošnice armory, including modifications of outdoor areas. The new armory will be structurally resilient to the effects of extraordinary impacts of high snowfall, massive icing, orcs, windstorms and extreme droughts that plague the current unsatisfactory object of the armory. Thanks to the resistance of the armory building there will be a...
  • curprev 22:0522:05, 23 October 2020DG Regio talk contribs 12,436 bytes −921 Removed claim: summary (P836): The project’s implementation is intended to be a complete reconstruction and extension of the use of the building of JSDH “Třeboňský kapr”, including the use of outdoor areas. New arms will be built in order to withstand the effects of high snowfall, massive icing, hurricanes, wind storms and extreme drought affecting the current unsatisfactory arms object. As a result of the resistance of the arms building, the operational unit of the JSDH “T...

17 July 2020

7 June 2020

25 March 2020

27 February 2020

  • curprev 06:1206:12, 27 February 2020DG Regio talk contribs 11,655 bytes +921 Created claim: summary (P836): The project’s implementation is intended to be a complete reconstruction and extension of the use of the building of JSDH “Třeboňský kapr”, including the use of outdoor areas. New arms will be built in order to withstand the effects of high snowfall, massive icing, hurricanes, wind storms and extreme drought affecting the current unsatisfactory arms object. As a result of the resistance of the arms building, the operational unit of the JSDH “Tře...

18 February 2020

12 February 2020

7 February 2020

30 January 2020

29 January 2020

16 January 2020

11 January 2020